FIELD: mining.
SUBSTANCE: during implementation of the method a stem the cross dimension of which is smaller than well diameter is lowered into well by means of stem lowering mechanisms attached to the stem. First, expansion is made in well at distance of 1-2.5 m from day surface; then, stem with stem lowering mechanisms fixed on one of its sides is lowered into well and its edges are located perpendicular to well wall till it reaches the expansion into which the stem ends are led.
EFFECT: increasing blast efficiency, reliability if stem installation, and reducing the cost of blasting operations.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
SUSPENSION WELL STEMMING | 2009 |
|
RU2409805C1 |
SUSPENDED BOREHOLE PLUG | 2008 |
|
RU2371671C1 |
SUSPENDED DOWN-HOLE STEMMING | 2011 |
|
RU2459178C1 |
SUSPENDED WELL STEM | 2019 |
|
RU2713833C1 |
SUSPENDED BOREHOLE TAMPING | 2009 |
|
RU2401416C1 |
SUSPENDED WELL STEM | 2018 |
|
RU2699102C1 |
SUSPENDED WELL STEM | 2010 |
|
RU2441197C1 |
SUSPENSION WELL STEMMING | 2012 |
|
RU2506533C1 |
SUSPENDED WELL STEM | 2009 |
|
RU2419063C1 |
SUSPENDED WELL STEM | 2020 |
|
RU2740967C1 |
Authors
Dates
2011-11-27—Published
2010-05-04—Filed