FIELD: mining.
SUBSTANCE: prior to the start-up of overlapping mechanism it is equipped with bypass mechanism that provides pressure equalisation outside and inside the overlapping mechanism at its lowering with the well flushing, which prevents premature irreversible plastic deformation of shapes of the overlapping mechanism at excess pressure in the overlapping mechanism over critical value. After the overlapping mechanism is lowered to the well installation interval, bypass mechanism is switched off and overlapping mechanism is installed.
EFFECT: improving installation reliability of overlapping mechanism.
4 cl, 10 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR ISOLATION OF A COMPLICATION ZONE WITH PRE-FLUSHING | 2019 |
|
RU2708740C1 |
DEVICE FOR ISOLATING PROBLEMATIC ZONES BY PROFILE SHUTTER WITH CYLINDRICAL SECTIONS AT WELL DRILLING | 2016 |
|
RU2618546C1 |
METHOD FOR INSTALLATION OF SHAPED SHUTTER IN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2019 |
|
RU2719881C1 |
METHOD FOR INSTALLATION OF SHAPED SHUTTER IN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2705671C1 |
GUIDE SHOE FOR INSTALLATION OF SHAPED SHUTTER IN WELL | 2019 |
|
RU2720728C1 |
METHOD FOR CEMENTING SHANK IN WELL AND DEVICE THEREFOR | 2015 |
|
RU2595122C1 |
SHOE FOR PLACEMENT OF PROFILE SHUTTER IN WELL | 2010 |
|
RU2416021C1 |
DIVERTING WEDGE FOR SPUDDING OF OFFSHOOTS FROM WELL | 2010 |
|
RU2429335C1 |
SHOE FOR INSTALLATION OF SHAPED OVERLAPPING MECHANISM IN WELL | 2011 |
|
RU2469176C1 |
DEVICE FOR CEMENTING SHANK END IN WELL | 2010 |
|
RU2431732C1 |
Authors
Dates
2011-12-10—Published
2010-05-25—Filed