FIELD: construction.
SUBSTANCE: one bridge support, two bridge beams (2) and two support bars (3) are manufactured almost in vertical position. Support bars (3) are connected to top of the support and to bridge beams (2). By lifting the end points (9) of bridge beams (2), which are located near the support, bridge beams (2) are put to final horizontal position. Then, end points (9) of bridge beams (2) are connected to the support.
EFFECT: reducing moment loads in bridge beam.
20 cl, 32 dwg
Title | Year | Author | Number |
---|---|---|---|
HYBRID BRIDGE SPAN | 2022 |
|
RU2794115C1 |
BRIDGE CONSTRUCTION METHOD | 2007 |
|
RU2340723C1 |
FRAMEWORK OF BRIDGE | 2007 |
|
RU2337206C1 |
COLLAPSIBLE UNIVERSAL BRIDGE | 2014 |
|
RU2578231C1 |
BRIDGE SPAN STRUCTURE ERECTION METHOD | 2005 |
|
RU2280121C1 |
BUILT-UP BRIDGE BEAM AND BRIDGE ROAD | 1995 |
|
RU2100523C1 |
CONSTRUCTION METHOD FOR BRIDGE OR OVERPASS | 2002 |
|
RU2251604C2 |
BRIDGE BLOCK OF MULTI-SPAN BRIDGE | 1992 |
|
RU2065515C1 |
BRIDGE CONSTRUCTION, ENCLOSING EMBANKMENT OF RAIL WAY BED OF THE BRIDGE CONSTRUCTION, JOINING THE BRIDGE CONSTRUCTION TO ACCESS EMBANKMENT AND REINFORCED SKELETON OF BRIDGE CONSTRUCTION BEAM | 1992 |
|
RU2043458C1 |
METHOD OF BRIDGE SPAN ASSEMBLY | 2008 |
|
RU2385982C1 |
Authors
Dates
2011-12-20—Published
2007-05-21—Filed