FIELD: mining.
SUBSTANCE: method involves delineation of balance and industrial reserves as per the data of exploration wells, drilling and mining activities; re-delineation of industrial reserves is performed after their delineation along the top of sands. At that, new contour at excavation of rock mass is set from cross point of exploration well with initial contour of industrial reserves at minimum elevation of balance reserves as to top of bed of sands to cross point of contour of balance sands-peat reserves at an exit angle of excavating transport vehicle of stripping equipment, and where there are no cross points of new contour with contour of balance reserves as to top of bed of sands - parallel to initial contour of industrial reserves.
EFFECT: reducing operating losses of useful component.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO MINE GRAVEL DEPOSITS OF MINERALS | 2011 |
|
RU2476674C1 |
METHOD OF BULLDOZER CAPPING OF MINERAL FIELDS | 2011 |
|
RU2471991C1 |
METHOD OF TIERED GRAVEL DEPOSIT MINING BY CONTINENTAL BUCKET DREDGES | 2006 |
|
RU2330957C1 |
METHOD FOR MINING OF INUNDATED PLACERS | 1991 |
|
RU2011826C1 |
DEVELOPMENT METHOD OF BOULDER GRAVEL MINERAL DEPOSITS | 2010 |
|
RU2434136C1 |
METHOD FOR DRAINAGE DEVELOPMENT OF PLACERS | 2018 |
|
RU2681168C1 |
METHOD FOR DREDGE WORK OF PLACER DEPOSITS | 2016 |
|
RU2629187C1 |
METHOD FOR OPEN-UNDERGROUND DEVELOPMENT OF FLAT-LYING FORMATIONS | 2019 |
|
RU2715503C1 |
METHOD OF MINING METAL-BEARING SANDS HIDDEN UNDER SOIL | 0 |
|
SU883450A1 |
OPENCAST MINING METHOD | 0 |
|
SU1742481A1 |
Authors
Dates
2011-12-20—Published
2010-05-27—Filed