FIELD: mining.
SUBSTANCE: in the method to mine gravel deposits, including contouring of balance reserves by data of exploration wells, opening of a sand bed, performance of opening and production works, after contouring of balance reserves the opening works are carried out with solid transverse trips into a dump to the level of the maximum elevation of the balance reserves contour. Production works are started by slabbing with a bulldozer in the area of the maximum elevation of the balance reserves contour with transportation of sands into a mined space. Each subsequent lifting of the balance reserves contour is mined in the similar manner, peats located between lifts of the balance reserves contour are transported through slabbing with secondary displacement into the dump.
EFFECT: reduced operational losses of a useful component.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF GRAVEL DEPOSITS OF MINERAL RESOURCES | 2010 |
|
RU2436957C1 |
METHOD OF BULLDOZER CAPPING OF MINERAL FIELDS | 2011 |
|
RU2471991C1 |
METHOD OF TIERED GRAVEL DEPOSIT MINING BY CONTINENTAL BUCKET DREDGES | 2006 |
|
RU2330957C1 |
DEVELOPMENT METHOD OF BOULDER GRAVEL MINERAL DEPOSITS | 2010 |
|
RU2434136C1 |
METHOD FOR DRAINAGE DEVELOPMENT OF PLACERS | 2018 |
|
RU2681168C1 |
METHOD FOR DEVELOPMENT OF DIFFICULT TO WASH AND BOULDER ALLUVIAL MINERAL DEPOSITS | 2019 |
|
RU2716662C1 |
METHOD OF OPENCAST MINING OF PERMAFROST PLACER DEPOSITS WITH INTERNAL DUMP FORMATION | 2001 |
|
RU2215148C2 |
OPEN CUT DEVELOPMENT METHOD FOR STEEPLY LOW STRATIFIED DEPOSITS | 2012 |
|
RU2506425C1 |
METHOD FOR MINING OF INUNDATED PLACERS | 1991 |
|
RU2011826C1 |
METHOD FOR DREDGE WORK OF PLACER DEPOSITS | 2016 |
|
RU2629187C1 |
Authors
Dates
2013-02-27—Published
2011-08-12—Filed