FIELD: oil and gas industry.
SUBSTANCE: formation hydraulic fracturing method involving placement into the well interval at the depth of the planned hydraulic fracturing and above it of water-based gel of "Khimeko-V" complex with strong granular substance with fraction of 0.4-0.8 mm in the suspended state; placement in the well above the above said water-based gel of process liquid with density of 1.8-2.0 g/cm3; reduction of the level of well liquid to the level of 150-190 m from the well head, sealing of well head with possibility of liquid flow throttling and creation of cracks in the formation by means of water-based gel of "Khimeko-V" complex with the energy released at combustion of the charge placed in water-based gel zone of "Khimeko-V" complex and against geological differences of formation rocks and/or their disturbances; at that, total volume of water-based gel of "Khimeko-V" complex is assumed on the basis of 0.3-0.4 m3 per 1 running metre of effective thickness of the formation.
EFFECT: increasing intensification effect of the product inflow from the formation owing to reducing the charge energy losses, increasing the operating safety and improving the effect of stable formation drainage in time.
1 ex
Title | Year | Author | Number |
---|---|---|---|
FORMATION HYDRAULIC FRACTURING METHOD | 2010 |
|
RU2439310C1 |
HYDRAULIC FRACTURING METHOD FOR LOW-PERMEABLE BED WITH CLAY LAYERS AND BOTTOM WATER | 2014 |
|
RU2544343C1 |
PRODUCTIVE FORMATION HYDRAULIC FRACTURING METHOD | 2011 |
|
RU2453695C1 |
FORMATION HYDRAULIC FRACTURING METHOD | 2011 |
|
RU2453694C1 |
METHOD FOR HYDRAULIC FRACTURING OF BED IN CONJUNCTION WITH ISOLATION OF WATER INFLUXES IN PRODUCT WELLS WITH USE OF GEL-FORMING LIQUIDS ON HYDROCARBON AND WATER BASES | 2004 |
|
RU2256787C1 |
WELL OPERATION INTENSIFICATION METHOD | 2012 |
|
RU2494243C1 |
METHOD OF HYDRAULIC FRACTURING OF WELL FORMATION | 2011 |
|
RU2485306C1 |
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL | 2011 |
|
RU2472926C1 |
METHOD FOR IMPROVEMENT OF HYDRODYNAMIC CONNECTION OF WELL WITH PRODUCTIVE FORMATION | 2011 |
|
RU2462590C1 |
METHOD FOR MULTIPLE FORMATION HYDRAULIC FRACTURING IN HORIZONTAL WELL SHAFT | 2013 |
|
RU2539469C1 |
Authors
Dates
2012-01-10—Published
2010-07-30—Filed