FIELD: mining.
SUBSTANCE: method involves drilling of a horizontal well shaft, lowering and fixation of a shank with filters, lowering of a packer and its seating, formation of cracks in each of the zones, which correspond to intervals of parts of the horizontal shaft with insulation of the rest of its parts. With that, the lower end of a pipe string is located 1 m closer to the mouth from the distant formation interval; a string of flexible pipes is lowered into the above pipe string and it is equipped from below with an abrasive jet perforator; space between the pipe string and the string of flexible pipes is sealed at the well mouth. Groups of slit perforation holes are made with length of 20-30 cm and width of 15 mm with a phasing angle of 60° in every 1.5 m of the oil-saturated formation interval in the shank; reverse flushing is performed together with simultaneous movement of the string of flexible pipes from the mouth to the face throughout the length of the oil-saturated formation interval; the string of flexible pipes with a jet nozzle is removed, and hydraulic formation fracturing is performed with further fixation of a fracture by light-weight resin-coated propping agent with fraction size of 20/40 mesh in concentration of 1400 kg/m3 and its filling to the horizontal well shaft opposite the oil-saturated formation interval; the packer is removed; the pipe string is moved in the direction from the face to the mouth to the next oil-saturated formation interval; after that, the above operations are repeated starting from seating of the packer and ending with the packer removal in the rest oil-saturated formation intervals developed by the horizontal well shaft.
EFFECT: improving reliability of hydraulic formation fracturing and efficiency of fracture fixing.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL | 2017 |
|
RU2667240C1 |
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL | 2017 |
|
RU2655309C1 |
METHOD OF LAYER MULTIPLE HYDRAULIC FRACTURING IN INCLINED BOREHOLE | 2015 |
|
RU2601881C1 |
METHOD FOR HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL | 2016 |
|
RU2613403C1 |
INTERVAL HYDRAULIC FRACTURING OF CARBONATE FORMATION IN HORIZONTAL WELLBORE WITH BOTTOM WATER | 2014 |
|
RU2558058C1 |
METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL BOREHOLE OF WELL | 2019 |
|
RU2708747C1 |
METHOD OF MULTIPLE HYDROFRACTURING OF FORMATION IN OPEN HOLE OF HORIZONTAL WELL | 2013 |
|
RU2537719C1 |
METHOD OF MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN OPEN INCLINED WELL HOLE | 2017 |
|
RU2667561C1 |
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT | 2014 |
|
RU2547892C1 |
METHOD FOR FORMATION HYDRAULIC FRACTURING IN HORIZONTAL OPEN WELL SHAFT | 2014 |
|
RU2541693C1 |
Authors
Dates
2015-01-20—Published
2013-12-16—Filed