FIELD: oil and gas industry.
SUBSTANCE: method involves lowering of packer on a pipe string with its further mounting in the well, formation of cracks opposite filters in series at different intervals of productive formation opened with horizontal shaft, supply of hydraulic fracturing fluid through the filter installed in each of the parts of horizontal shaft, which corresponds to each of those intervals, with insulation of the rest of its parts. According to the invention, direction of horizontal shaft is determined relative to direction of minimum primary stress. Then, interval subject to formation hydraulic fracturing (FHF) is isolated from the rest sections of horizontal shaft by installation of double packers. Then, a valve arranged inside the pipe string between double packers opposite the filter is opened. If direction of horizontal shaft is parallel to direction of minimum primary stress, hydraulic formation fracturing is performed by pumping of fracturing fluid with formation of transverse cracks relative to horizontal shaft with further reinforcement of transverse cracks by pumping of the fluid with aluminosilicate proppant with gradual increase of its fraction from 20/40 mesh to 16/30 mesh. If direction of horizontal shaft is perpendicular to direction of minimum primary stress, hydraulic formation fracturing is performed by pumping of fracturing fluid with formation of horizontal cracks relative to horizontal shaft with further reinforcement of horizontal cracks by pumping of the fluid with light-weight proppant with fraction of 20/40 mesh. After FHF is completed, the well is closed for the process pause during half the hour. After that, an adjustable choke is installed on pipe string at the well head and waste proppant fluid is drained from the formation via the pipe string on the well head before the valve is closed. By adjusting the above choke during the drain process, the value of pressure in pipe string becomes by 2-3 MPa lower that the value of pressure when the well is opened after the process pause. Packer is removed and pipe string is moved to the other part of horizontal shaft. The above FHF process performed in horizontal shaft of the well is repeated depending on number of intervals of horizontal shaft.
EFFECT: improving the efficiency of hydraulic fracturing of rocks.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MULTIPLE FORMATION HYDRAULIC FRACTURING IN HORIZONTAL WELL SHAFT | 2013 |
|
RU2539469C1 |
METHOD FOR FORMATION HYDRAULIC FRACTURING IN HORIZONTAL OPEN WELL SHAFT | 2014 |
|
RU2541693C1 |
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT | 2013 |
|
RU2526062C1 |
INTERVAL HYDRAULIC FRACTURING OF CARBONATE FORMATION IN HORIZONTAL WELLBORE WITH BOTTOM WATER | 2014 |
|
RU2558058C1 |
METHOD OF MULTIPLE HYDROFRACTURING OF FORMATION IN OPEN HOLE OF HORIZONTAL WELL | 2013 |
|
RU2537719C1 |
METHOD OF OIL POOL DEVELOPMENT BY HORIZONTAL WELLS WITH MULTIPLE HYDRAULIC FRACTURING | 2013 |
|
RU2528309C1 |
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT | 2014 |
|
RU2547892C1 |
METHOD OF PRODUCTIVE FORMATION HYDRAULIC FRACTURING WITH CLAY LAYER AND GAS-BEARING HORIZON | 2016 |
|
RU2613689C1 |
HYDRAULIC FRACTURING METHOD FOR LOW-PERMEABLE BED WITH CLAY LAYERS AND BOTTOM WATER | 2014 |
|
RU2544343C1 |
FORMATION HYDRAULIC FRACTURING METHOD (OPTIONS) AND COUPLING FOR ITS IMPLEMENTATION | 2021 |
|
RU2765186C1 |
Authors
Dates
2013-01-20—Published
2011-07-20—Filed