METHOD FOR MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN HORIZONTAL SHAFT OF WELL Russian patent published in 2013 - IPC E21B43/267 C09K8/90 

Abstract RU 2472926 C1

FIELD: oil and gas industry.

SUBSTANCE: method involves lowering of packer on a pipe string with its further mounting in the well, formation of cracks opposite filters in series at different intervals of productive formation opened with horizontal shaft, supply of hydraulic fracturing fluid through the filter installed in each of the parts of horizontal shaft, which corresponds to each of those intervals, with insulation of the rest of its parts. According to the invention, direction of horizontal shaft is determined relative to direction of minimum primary stress. Then, interval subject to formation hydraulic fracturing (FHF) is isolated from the rest sections of horizontal shaft by installation of double packers. Then, a valve arranged inside the pipe string between double packers opposite the filter is opened. If direction of horizontal shaft is parallel to direction of minimum primary stress, hydraulic formation fracturing is performed by pumping of fracturing fluid with formation of transverse cracks relative to horizontal shaft with further reinforcement of transverse cracks by pumping of the fluid with aluminosilicate proppant with gradual increase of its fraction from 20/40 mesh to 16/30 mesh. If direction of horizontal shaft is perpendicular to direction of minimum primary stress, hydraulic formation fracturing is performed by pumping of fracturing fluid with formation of horizontal cracks relative to horizontal shaft with further reinforcement of horizontal cracks by pumping of the fluid with light-weight proppant with fraction of 20/40 mesh. After FHF is completed, the well is closed for the process pause during half the hour. After that, an adjustable choke is installed on pipe string at the well head and waste proppant fluid is drained from the formation via the pipe string on the well head before the valve is closed. By adjusting the above choke during the drain process, the value of pressure in pipe string becomes by 2-3 MPa lower that the value of pressure when the well is opened after the process pause. Packer is removed and pipe string is moved to the other part of horizontal shaft. The above FHF process performed in horizontal shaft of the well is repeated depending on number of intervals of horizontal shaft.

EFFECT: improving the efficiency of hydraulic fracturing of rocks.

Similar patents RU2472926C1

Title Year Author Number
METHOD FOR MULTIPLE FORMATION HYDRAULIC FRACTURING IN HORIZONTAL WELL SHAFT 2013
  • Ismagilov Fanzat Zavdatovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
  • Salimov Vjacheslav Gajnanovich
RU2539469C1
METHOD FOR FORMATION HYDRAULIC FRACTURING IN HORIZONTAL OPEN WELL SHAFT 2014
  • Rakhmanov Rafkat Mazitovich
  • Ismagilov Fanzat Zavdatovich
  • Garifov Kamil' Mansurovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2541693C1
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT 2013
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
  • Salimov Vjacheslav Gajnanovich
  • Zhirkeev Aleksandr Sergeevich
RU2526062C1
INTERVAL HYDRAULIC FRACTURING OF CARBONATE FORMATION IN HORIZONTAL WELLBORE WITH BOTTOM WATER 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
  • Mansurov Ajdar Ul'Fatovich
RU2558058C1
METHOD OF MULTIPLE HYDROFRACTURING OF FORMATION IN OPEN HOLE OF HORIZONTAL WELL 2013
  • Rakhmanov Rafkat Mazitovich
  • Ismagilov Fanzat Zavdatovich
  • Garifov Kamil' Mansurovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2537719C1
METHOD OF OIL POOL DEVELOPMENT BY HORIZONTAL WELLS WITH MULTIPLE HYDRAULIC FRACTURING 2013
  • Khisamov Rais Salikhovich
  • Salikhov Ilgiz Misbakhovich
  • Akhmetgareev Vadim Valer'Evich
RU2528309C1
MULTIPLE HYDRAULIC FRACTURING OF FORMATION IN WELL HORIZONTAL SHAFT 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Salimov Vjacheslav Gajnanovich
RU2547892C1
METHOD OF PRODUCTIVE FORMATION HYDRAULIC FRACTURING WITH CLAY LAYER AND GAS-BEARING HORIZON 2016
  • Nasybullin Arslan Valerevich
  • Salimov Oleg Vyacheslavovich
  • Ziyatdinov Radik Zyauzyatovich
RU2613689C1
HYDRAULIC FRACTURING METHOD FOR LOW-PERMEABLE BED WITH CLAY LAYERS AND BOTTOM WATER 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Sulejmanov Farid Bashirovich
  • Salimov Vjacheslav Gajnanovich
RU2544343C1
FORMATION HYDRAULIC FRACTURING METHOD (OPTIONS) AND COUPLING FOR ITS IMPLEMENTATION 2021
RU2765186C1

RU 2 472 926 C1

Authors

Fajzullin Ilfat Nagimovich

Khisamutdinov Alik Ismagzamovich

Taipova Venera Asgatovna

Salimov Oleg Vjacheslavovich

Sulejmanov Farid Bashirovich

Dates

2013-01-20Published

2011-07-20Filed