FIELD: mining.
SUBSTANCE: in process of ore deposits mining at first driving is carried out in a foot wall of a block or a ventilating risers, scraping drifts. In an ore body there are additional scraping drifts, which are knocked together with drilling risers. Then drilling risers are cut into access chambers by means of ore cutting and scraping to ore chutes, cutting of ore chutes into outlet craters and excavation of ore massif above scraping drifts. Afterwards driving of horizontal ore mines is started, which cut drilling risers with access chambers, and a part of ore massif is mined with cutting of a drill riser with an access chamber with blasting delivery of ore into access chambers jointly with extraction of panel reserves. Prior to extraction of ore massif above additional scraping drifts the worked space is filled in an above panel with injection of a binding material of a lower part of a filled massif.
EFFECT: prevention of damage and degradation of earth surface above mining works with preservation of minimum ore losses.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INCLINED ORE DEPOSIT DEVELOPMENT | 2006 |
|
RU2307936C1 |
METHOD OF MINING OF INCLINED ORE DEPOSITS | 2001 |
|
RU2215147C2 |
METHOD OF MINING PARALLEL-CONTIGUOUS DEPOSITS | 0 |
|
SU1709094A1 |
METHOD OF MINING MINERAL DEPOSITS | 0 |
|
SU1456572A1 |
METHOD FOR MINING OF INCLINED ORE BODIES | 1994 |
|
RU2069755C1 |
DEVELOPMENT METHOD OF FLAT AND INCLINED THICK ORE BODIES | 2011 |
|
RU2472932C1 |
METHOD OF MINING ORE BODIES | 2022 |
|
RU2796836C1 |
METHOD OF EXCAVATING AN INTER-CHAMBER PILLAR | 0 |
|
SU964148A1 |
METHOD OF DEVELOPING THICK ORE DEPOSITS BY UNDERGROUND MINING WITH INTERCHAMBER PILLARS SUPPORT | 2009 |
|
RU2405109C1 |
METHOD FOR MINING PARALLEL CONTIGUOUS DEPOSITS | 0 |
|
SU1789688A1 |
Authors
Dates
2012-01-10—Published
2010-09-09—Filed