FIELD: mining, particularly to develop underground inclined ore deposits having mean thickness.
SUBSTANCE: method involves driving block rise workings, main slushier drifts in ledge wall; forming additional slushier drifts in ore body; connecting main and additional slushier drifts with interpanel raise mines; cutting interpanel raise mines in breakage chambers by breaking operation; slushier ore from breakage chambers to ore passes via additional slushier drifts; cutting ore passes in outfall funnels and excavating ore massif over main slushier drifts with the use of additional slushier drifts for drill around operation; communicating next interpanel rise mine with breakage chamber; cutting ore massif part over linkage heading along with breakage chamber cutting along with ore delivery in breakage chamber by blasting operation.
EFFECT: decreased losses along with increased operational safety.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO MINE INCLINED ORE DEPOSITS | 2010 |
|
RU2439323C1 |
METHOD OF MINING OF INCLINED ORE DEPOSITS | 2001 |
|
RU2215147C2 |
METHOD OF EXCAVATING AN INTER-CHAMBER PILLAR | 0 |
|
SU964148A1 |
DEVELOPMENT METHOD OF FLAT AND INCLINED THICK ORE BODIES | 2011 |
|
RU2472932C1 |
METHOD OF MINING PARALLEL-CONTIGUOUS DEPOSITS | 0 |
|
SU1709094A1 |
METHOD OF MINING MINERAL DEPOSITS | 0 |
|
SU1456572A1 |
METHOD OF MINING STEEP ORE BODIES | 0 |
|
SU705110A1 |
METHOD FOR WORKING INCLINED ORE OBSTRUCTIONS | 0 |
|
SU1661422A1 |
METHOD OF WORKING INTERCHAMBER PILLAR | 1991 |
|
RU2010972C1 |
METHOD OF MINING STEEP ORE BODIES | 0 |
|
SU1121438A1 |
Authors
Dates
2007-10-10—Published
2006-08-14—Filed