FIELD: oil-and-gas production.
SUBSTANCE: proposed method comprises creating prolonged wave a effects on reservoir in oil production and using standard pump units operated in cyclic duty. Note here that extracted oil and production equipment are controlled, their parameters and variations therein being analysed with due allowance for changes in reservoir power and filtration changes. Proposed device consists of switch, measuring unit, control unit, data control unit connected via first and second modems and communication line with the device control unit and production complex measuring units terminals.
EFFECT: cyclic duty of production and wave effects, continuous measurement of operating parameters.
7 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR CLEANING PRODUCTION STRING AT CYCLIC MODE OF FLUID EXTRACTION AND CONTROL DEVICE FOR REALISATION OF THIS PROCEDURE | 2010 |
|
RU2415252C1 |
OIL PRODUCTION METHOD AND DEVICE (VARIANTS) | 2003 |
|
RU2278957C2 |
POWER CONSUMPTION MINIMISATION METHOD WHILE ENSURING GIVEN LIQUID RATE AND ASSOCIATED CONTROL UNIT | 2007 |
|
RU2352768C2 |
CONTROL METHOD FOR PRODUCTION AND ACTIONS SYSTEM AT WELLS CLUSTER | 2014 |
|
RU2548460C1 |
PROCESS OF TREATMENT OF CRITICAL AREA OF FORMATION | 2000 |
|
RU2190762C2 |
METHOD FOR HYDRODYNAMIC TESTS OF EXPLOITATION WELL FORMATION (VERSIONS) | 2015 |
|
RU2598256C1 |
METHOD AND DEVICE FOR FORMATION GEOMECHANICAL IMPACT | 2018 |
|
RU2680563C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2010 |
|
RU2406816C1 |
METHOD FOR DEVELOPMENT OF LOW-PERMEABILITY OIL DEPOSIT | 2023 |
|
RU2813421C1 |
METHOD OF BOTTOMHOLE TREATMENT | 0 |
|
SU1677279A1 |
Authors
Dates
2012-01-27—Published
2010-05-19—Filed