FIELD: power industry.
SUBSTANCE: ampule filling device is made in the form of cylindrical shell in upper part of which aligning elements are installed and longitudinal slots are made, which provide the possibility of visual inspection of ampule loading and movement process. In middle part of the shell there arranged is mechanism for opening the ampule cover lock, and in lower part of the shell - assembly of ampule spatial orientation, which sets its angular and altitude position. Aligning elements are made in the form of inlet funnel and aligning rollers. Ampule cover lock opening mechanism is made in the form of turning levers entering the radial holes of ampule shell. Ampule spatial orientation assembly is made in the form of a crown with two opposite slots and two tops which have different height, are rounded and upward directed.
EFFECT: possibility of filling ampules with opening of its lock at external visual inspection.
10 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
AMPOULE FOR SPENT FUEL ASSEMBLY | 2008 |
|
RU2353010C1 |
PROCESS OF SPENT FUEL ASSEMBLY LOADING INTO CAPSULE FOR FURTHER STORAGE, AND CAPSULE FOR IMPLEMENTING PROCESS | 2006 |
|
RU2328046C2 |
AMPOULE FOR SPENT FUEL ASSEMBLY | 2017 |
|
RU2670104C1 |
CARTRIDGE FOR SPENT FUEL ASSEMBLY | 2009 |
|
RU2403638C1 |
METHOD TO LOAD BUNDLE OF FUEL ELEMENTS OF SPENT DOUBLE-BUNDLE FUEL ASSEMBLY OF NUCLEAR REACTOR INTO AMPOULE AND DEVICE FOR ITS REALISATION | 2014 |
|
RU2565058C1 |
METHOD FOR CUTTING A TWO-BEAM FUEL ASSEMBLY OF A NUCLEAR REACTOR AND A DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2650187C2 |
SEALED USED NUCLEAR FUEL PACKAGE FOR REACTOR LWGR-1000 | 2013 |
|
RU2562055C2 |
TIGHT CASE FOR STORAGE OF SPENT NUCLEAR FUEL | 2008 |
|
RU2372678C1 |
METHOD AND FACILITY FOR STRIPPING SPENT FUEL ASSEMBLY OF NUCLEAR REACTOR | 2001 |
|
RU2208849C2 |
CARTRIDGE FOR SPENT FUEL ASSEMBLY | 2012 |
|
RU2505871C1 |
Authors
Dates
2012-03-10—Published
2010-07-08—Filed