FIELD: construction.
SUBSTANCE: method to assemble an inventory low-water bridge on screw piles, in which a coastal support is equipped on an entry bank, and the inventory property of the bridge is stocked near the water edge. A ferry with pile fixators attached to it is dropped to water, and an autocrane is installed on it with parts of serial screw supports placed onto the ferry and inserted into the bridge range. Screw piles are inserted into fixators by the autocrane, a detachable capstan is put on and fixed on them. A rope is attached into the capstan, and a pile is screwed into soil by means of autocrane weight lifting. Then the operation is repeated with the second pile, and the autocrane mounts a serial screw support, afterwards the operation of serial screw support assembly is repeated. Then the ferry with the autocrane is installed into the first bridge span, and it picks the rolled beams from the shore and lays them into the first and second bridge spans. Afterwards the ferry with the autocrane is moved into the second span, and rolled beams are laid from the second into the third span. Then the traffic area and the breast rail are assembled manually, exits from the bridge are arranged.
EFFECT: reduced labour inputs, higher efficiency of low-water bridges construction under wartime conditions, disasters and emergencies.
10 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ASSEMBLE INVENTORY LOW-WATER BRIDGE ON SCREW PILES BY SPAN LAUNCHING | 2010 |
|
RU2446246C2 |
METHOD OF INSTALLING FLYOVER ON SCREW PILES | 2017 |
|
RU2659287C1 |
INVENTORY LOW-WATER BRIDGE ON SCREW PILES | 2010 |
|
RU2446244C2 |
METHOD FOR LOW-LEVEL BRIDGE ERECTION | 2004 |
|
RU2277143C1 |
INSTALLATION OF UNDERWATER ROAD DEMOUNTABLE BRIDGE IN DESIGN POSITION OF SUPERSTRUCTURE WITH ONE INTERMEDIATE PILE-SHOE SUPPORT | 2019 |
|
RU2737748C1 |
METHOD FOR COMPENSATING FOR TEMPERATURE CHANGES IN THE LENGTH OF THE NzHm-56 FLOATING RAILWAY BRIDGE DURING THE WITHDRAWAL AND INPUT OF THE OUTLET FERRY DURING THE PASSING THROUGH OF SHIPS | 2020 |
|
RU2745580C1 |
FLOATING ROAD BRIDGE | 2023 |
|
RU2825359C1 |
METHOD OF MOUNTING IMZH-500 RAILROAD BRIDGE WITH COLLAPSIBLE RAILWAY CANTILEVER CRANE FOR INSTALLATION OF SUPPORT AND SPANS IN ONE PROCESS CYCLE | 2020 |
|
RU2740595C1 |
FERRYBOAT FOR MOUNTING SPAN STRUCTURES OF LOW-WATER BRIDGE | 0 |
|
SU850786A1 |
COLLAPSIBLE CANTILEVER CRANE | 2021 |
|
RU2774693C1 |
Authors
Dates
2012-03-27—Published
2007-11-16—Filed