FIELD: bridge building.
SUBSTANCE: floating road bridge consists of truss span structures with running downwards, floating supports from barge platforms, abutments, entrances, ramps. Truss span structures are made with length of more than 77 m, deck barges-platforms of river fleet have carrying capacity of 1,500 t, are equipped with two support platforms with rollers and one support-rotary mechanism. For passage of river fleet vessels, truss span in alignment between abutment and barge platform is made with possibility of sliding on bridge abutment, or turning of span together with barge through angle of 90° and displacement towards the nearest barge.
EFFECT: reduced time of reconstruction and erection of floating bridge of large spans.
1 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COMPENSATING FOR TEMPERATURE CHANGES IN THE LENGTH OF THE NzHm-56 FLOATING RAILWAY BRIDGE DURING THE WITHDRAWAL AND INPUT OF THE OUTLET FERRY DURING THE PASSING THROUGH OF SHIPS | 2020 |
|
RU2745580C1 |
INSTALLATION OF UNDERWATER ROAD DEMOUNTABLE BRIDGE IN DESIGN POSITION OF SUPERSTRUCTURE WITH ONE INTERMEDIATE PILE-SHOE SUPPORT | 2019 |
|
RU2737748C1 |
METHOD FOR DOCKING OF RIVER PARTS OF FLOATING BRIDGES MLZH-VF-VT AND NZHM-56 | 2018 |
|
RU2692363C1 |
METHOD FOR CREATION OF RIVER PART OF CONTINUOUS FLOATING RAILWAY BRIDGE | 2018 |
|
RU2716629C1 |
METHOD OF RECONSTRUCTION OF BRIDGEWORK WITH DISPLACEMENT OF RAILWAY BRIDGE FRAMEWORK AFLOAT AND ERECTION OF PEDESTRIAN BRIDGE | 2000 |
|
RU2198978C2 |
METHOD TO ASSEMBLE INVENTORY LOW-WATER BRIDGE ON SCREW PILES BY SPAN LAUNCHING | 2010 |
|
RU2446246C2 |
METHOD FOR JOINING COASTAL AND RIVER PARTS OF FLOATING UNIFIED RAILWAY RIBBON BRIDGE MLZH-VF-VT | 2020 |
|
RU2750370C1 |
FLOATING BRIDGE | 1993 |
|
RU2080431C1 |
METHOD FOR ERECTION OF PEDESTRIAN OVERPASS | 1999 |
|
RU2152475C1 |
METHOD OF BANK COMPENSATION FOR INVENTORY SURFACING RAILWAY BRIDGE AT HIGH SPEED OF RIVER FLOW | 2020 |
|
RU2739543C1 |
Authors
Dates
2024-08-26—Published
2023-12-11—Filed