FIELD: mining.
SUBSTANCE: control method of delivery of broken-rock pile extracted with getting machines operating at underground mine working at different points of a network of underground gains of the well, by means of transportation devices and bunker units, which are located in the network of underground gains of the well; at that, on the basis of actual data being recorded continuously, there determined is minimum allowable capacity of transportation devices and buffer capacity of bunker units and compared in the computer-aided control unit to current actual production rate and/or to the specified production rate expected for the specified time period and/or to the specified production rate of the associated getting machine, which is extrapolated as per the previous actual data; and at that, at the specified deviations the control unit implements automatic levelling of carrying capacity with transportation devices and bunker units and/or controls the production rate of the getting machine considering the capacity of in-series connected transportation devices and bunker units.
EFFECT: providing maximum and, when possible, constant product available at the transportation point of the mine.
11 cl
Authors
Dates
2012-03-27—Published
2008-01-09—Filed