METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS Russian patent published in 2016 - IPC E21B43/32 E21B33/138 

Abstract RU 2597220 C1

FIELD: oil industry.

SUBSTANCE: invention relates to oil and gas industry, particularly to operation and repair of wells and isolation of brine water influx in horizontal wells. Water flow isolation technique in uncased horizontal borehole section of a production well drilled in a carbonate reservoir includes extracting the pump equipment from the well, drilling below the main borehole of the well an additional borehole with a horizontal section along the water inflowing formation, lowering to the additional hole a tubing string by axial displacement from the face to the head with simultaneous supply of a water isolating material to the tubing string. Prior to lowering the tubing string an interval of the water inflow along the horizontal section in the main borehole is determined with further isolation of these intervals through the additional borehole by successive pumping polyaluminium chloride solution and polyacrylamide solution prepared on the formation water of the Devonian horizon and the lower part of the wall of the additional horizontal hole. Pumping of polyacrylamide solution is performed after pressing the polyaluminium chloride solution into the water-bearing stratum and holding it for gelling during one day. Pumping of polyacrylamide is performed on the side in the intervals of face and cutting of the additional horizontal hole, then the tubing string is removed from the additional hole. Prior to lowering the pump equipment a packer is installed equipped with a jointing assembly for connection of the tubing string to it, the well is put into operation with the bottom-hole pressure in the main borehole of 3.2-4.1 MPa, herewith the polyacrylamide solution additional pumping is carried out automatically from the vertical borehole filled with the polyacrylamide solution as it is filtered to the main hole of the horizontal well.

EFFECT: technical result of the invention is higher quality of water isolation treatment, the possibility of evaluating effectiveness of performed water isolation treatment during operation of the producing well, higher technological effectiveness of water isolation treatment at negative temperatures, reduced negative effect of chemical reagents on collector properties of the bottomhole zone of the producing well, increase of oil resources withdrawal from the productive formation.

1 cl, 4 dwg

Similar patents RU2597220C1

Title Year Author Number
WATER FLOW ISOLATION TECHNIQUE IN UNCASED HORIZONTAL BOREHOLE SECTION OF PRODUCING WELL 2014
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Nizaev Ramil' Khabutdinovich
  • Khasanova Dil'Barkhon Kelamedinovna
RU2560018C1
WATER INFLOW SHUTOFF METHOD IN FRACTURED CARBONATE RESERVOIRS 2014
  • Kadyrov Ramzis Rakhimovich
  • Zhirkeev Aleksandr Sergeevich
  • Sakhapova Al'Fija Kamilevna
  • Khasanova Dil'Barkhon Kelamedinovna
  • Bakalov Igor' Vladimirovich
RU2571474C1
METHOD FOR ISOLATION OF WATER FLOW IN OPEN HORIZONTAL SECTION PRODUCING WELLS 2014
  • Makhmutov Ilgizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Mansurov Ajdar Ulfatovich
RU2578095C1
METHOD OF WATER INFLOW LIMITATION IN FLOODED CARBONE RESERVOIRS 2016
  • Zhirkeev Aleksandr Sergeevich
  • Sakhapova Alfiya Kamilevna
  • Khasanova Dilbarkhon Kelamedinovna
  • Shigapov Niyaz Ilyasovich
RU2619778C1
METHOD FOR WATER INFLOW ISOLATION IN NON-CASED HORIZONTAL PART OF PRODUCTION WELL BORE 2004
  • Khisamov Rais Salikhovich
  • Kateev Irek Sulejmanovich
  • Kateev Rustem Irekovich
  • Salikhov Mirsaif Mirgazijanovich
  • Kandaurova Galina Fedorovna
RU2273722C2
HORIZONTAL WELL OPERATION METHOD 2014
  • Fatkullin Rashad Khasanovich
  • Makhmutov Il'Gizar Khasimovich
  • Bikbulatov Renat Rafaehl'Evich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
RU2558090C1
METHOD OF WELL'S HORIZONTAL BOREHOLE PART REPAIR INSULATION WORKS 2008
  • Makhmutov Il'Gizar Khasimovich
  • Zhirkeev Aleksandr Sergeevich
  • Strakhov Dmitrij Vital'Evich
  • Zijatdinov Radik Zjauzjatovich
  • Asadullin Marat Fagimovich
RU2379472C1
METHOD FOR HORIZONTAL WELL OPERATION 2011
  • Ibragimov Nail' Gabdulbarievich
  • Torikova Ljubov' Ivanovna
  • Musaev Gajsa Lemievich
  • Isakov Vladimir Sergeevich
RU2447265C1
METHOD FOR ISOLATION OF FORMATION WATER INFLUX AT SECTIONS OF THEIR SUPPLY IN WELLS WITH HORIZONTAL TERMINATION 2019
  • Leontev Dmitrij Sergeevich
RU2707109C1
METHOD FOR PREVENTION OF BOTTOM WATER INFLUX TO PRODUCING OIL WELL 2016
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Dolgushin Vladimir Alekseevich
  • Yagafarov Alik Kayumovich
  • Ankudinov Aleksandr Anatolevich
  • Popova Zhanna Sergeevna
  • Zhaparova Darya Vladimirovna
  • Ponomarev Andrej Aleksandrovich
RU2620684C1

RU 2 597 220 C1

Authors

Evdokimov Aleksandr Mikhajlovich

Nizaev Ramil Khabutdinovich

Novikov Igor Mikhajlovich

Bakirov Ilshat Mukhametovich

Kadyrov Ramzis Rakhimovich

Khasanova Dilbarkhon Kelamedinovna

Dates

2016-09-10Published

2015-09-21Filed