FIELD: oil and gas industry.
SUBSTANCE: group of inventions relates to oil and gas industry and can be used at entering the productive formations from wells reinforced by well tubing that are and were in operation. Method includes drilling of perforating channels in the wall of well tubing and annular space with the aid of a bore that is delivered to well tubing wall by bore supply unit through surface pipe. Bore build up is done after each deepening by the length of its rod that is automatically supplied from the loader by rod of the same length. Disconnection of bore supply unit from the composite rod left in perforated channel is done after reaching the specified depth of the channel. In the course of perforating channel formation the bore and composite rod are kept from moving in transverse direction inside the surface pipe rotating together with the bore and composite rod. The surface pipe and composite rod inside the surface pipe are fixed to prevent rotation in the moment of bore build up.
EFFECT: increase of reliability of productive formation entering irrespectively of getting into drilling zone of previously created channels, also presence of cavities and less dense areas in annular space.
6 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPENING PRODUCTIVE BED FROM WELL AND DEVICE FOR REALIZATION OF SAID METHOD | 2003 |
|
RU2244104C1 |
INSTALLATION FOR RESERVOIR EXPOSING | 2008 |
|
RU2394154C1 |
DEVICE FOR SECONDARY DRILLING-IN OF PRODUCTIVE STRATUM | 2003 |
|
RU2232873C1 |
METHOD FOR SECONDARY OPENING OF PRODUCTIVE BED | 1999 |
|
RU2147066C1 |
DEVICE FOR PERFORATING CASING COLUMN AND PIT-ADJACENT BED AREA | 2002 |
|
RU2238396C2 |
WELL BORING PERFORATOR | 1999 |
|
RU2182961C2 |
MECHANISM FOR MECHANICAL-HYDRAULIC PERFORATOR INSTALLATION AND RETAINING INSIDE WELL | 2006 |
|
RU2312978C1 |
METHOD FOR SECONDARY DRILLING OF PRODUCTIVE FORMATION WITH CREATION OF SYSTEM FROM EXTENDED DRAIN CHANNELS AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2457318C2 |
METHOD FOR DEEP CASING PIPE PERFORATION AND PERFORATION DEVICE FOR ABOVE METHOD REALIZATION | 2005 |
|
RU2286442C1 |
METHOD OF LAYER MULTIPLE HYDRAULIC FRACTURING IN INCLINED BOREHOLE | 2015 |
|
RU2601881C1 |
Authors
Dates
2012-04-27—Published
2010-04-05—Filed