FIELD: oil and gas industry.
SUBSTANCE: when realising the method, previously a structure is installed on a lifting pipe, comprising a set of running circular heaters to heat injection fluid in the inner cavity of the pipe, running circular heaters are connected by a cable with a source of power, the assembled structure is lowered into a well. Heat is transferred via holes in a lifting pipe into an inner cavity from heating elements of the running circular heaters to heat the injection fluid, with its subsequent movement in direction of a well bottom. The heated fluid via perforation holes of a casing pipe is injected into an oil bed, reducing oil viscosity in a bottom zone with its subsequent displacement in the bed.
EFFECT: reduced prime cost of produced oil due to lower power inputs.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO HEAT GAS-LIQUID MIXTURE IN WELL TO PREVENT DEPOSITS OF PARAFFIN ON WALLS OF LIFTING PIPES | 2010 |
|
RU2450117C1 |
METHOD FOR EXTRACTING HIGHLY WATERED OIL POOL | 2005 |
|
RU2289020C1 |
INDIVIDUAL OIL RESERVOIRS PRODUCTION RATE CONTINUOUS CONTROL METHOD DURING MULTI ZONE PRODUCTION | 2008 |
|
RU2382196C1 |
METHOD OF REDUCING OF CLOGGING OF PERFORATED APERTURES AND MAIN CRACKS OF POROUS MATRIX IN PRESSURE WELLS WITH SOLIDS OF IMPURITIES | 2006 |
|
RU2341649C2 |
METHOD OF EFFECT ONTO OIL RESERVOIR WITH ACOUSTIC FIELD BY MEANS OF DEEP WELL ROD PUMP OPERATION IN WELL | 2007 |
|
RU2355880C1 |
METHOD OF CONTROLLING SUBMERSIBLE ELECTRIC PUMP DURING PERIODIC PUMPING OF WELL LIQUID | 2017 |
|
RU2655494C1 |
MONITORING METHOD OF DYNAMIC FLUID LEVEL IN WELL FOR CONTROL OF SUBMERSIBLE ELECTRIC PUMP | 2011 |
|
RU2479715C1 |
METHOD OF CONTROL OF AXIAL LOAD ON BORE BIT BY DRILLING EFFICIENCY FACTOR | 2006 |
|
RU2333351C1 |
OIL WELL VISCOUS PRODUCTION METHOD | 2018 |
|
RU2710057C1 |
METHOD FOR THERMAL ACTION ON FORMATION | 2016 |
|
RU2612385C1 |
Authors
Dates
2012-05-10—Published
2010-10-19—Filed