FIELD: process engineering.
SUBSTANCE: invention relates to ecology, particularly, to reclamation of oil contaminated soils. In compliance with this invention, slimes of heat power plant chemical water cleaning are used as alkaline agent. Proposed process is carried out in highly loaded dump pit aerated at bottom by high-pressure pumps. At dump pit bottom, process is performed by intermittent mixing by gantry clamshell unless compost temperature reduces to ambient temperature. Compost temperature variation is determined by claimed mathematical expression. Process termination time is defined from claimed formulas.
EFFECT: process duration decreased from 1-3 months to 18-30 days.
5 dwg, 3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PROCESSING OIL SLUDGE AND CLEANING OIL CONTAMINATED SOIL | 2014 |
|
RU2584031C1 |
METHOD FOR TREATMENT AND UTILIZATION OF ORGANIC COMPOUND-CONTAINING WASTE | 2003 |
|
RU2249580C2 |
OIL SLUDGE PROCESSING METHOD | 2018 |
|
RU2691422C1 |
OIL SLUDGE TREATMENT METHOD | 2013 |
|
RU2549657C2 |
METHOD OF OIL SLUDGE PROCESS AND RESIDUE GROUND CLEANING | 2008 |
|
RU2376083C1 |
OIL SLURRY PROCESSING PLANT | 2018 |
|
RU2691582C1 |
METHOD OF TREATING OIL SLUDGE AND CLEANING OIL CONTAMINATED SOIL | 2015 |
|
RU2602179C1 |
METHOD FOR BIOTHERMAL TREATMENT OF WASTE WATER SEDIMENTS | 0 |
|
SU1816742A1 |
METHOD OF OIL SLUDGE UTILIZATION | 2018 |
|
RU2704654C1 |
METHOD CLEANING OIL SLUDGE AND OIL CONTAMINATED SOIL | 2015 |
|
RU2601973C1 |
Authors
Dates
2012-05-20—Published
2010-08-17—Filed