FIELD: transport.
SUBSTANCE: proposed method comprises mounting pump on berth to created jet flows directed from mooring facilities toward harborage. For this, manifold with branch pipes whereto water is forced by pump is arranged on wharf below minimum navigation water level. Pump suction pipeline is downed into pit made on harborage bottom. Dredger with pressure pipeline connected with manifold may be used as aforesaid pump.
EFFECT: better navigation conditions in winter.
2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR HYDRODYNAMIC ICE REMOVAL FROM DOCK COMPLEX AND DEVICE FOR ITS IMPLEMENTATION | 2020 |
|
RU2756108C1 |
COMPLEX FOR PREVENTION OF ICE FORMATION | 2017 |
|
RU2656385C1 |
ARRANGEMENT FOR PREVENTING ICE FORMATION OF FLOWING WATER SURFACE | 0 |
|
SU981502A1 |
ICE BERTH | 2021 |
|
RU2764806C1 |
APPARATUS FOR SUPPORTING LANE AROUND SUCTION DREDGER | 0 |
|
SU855119A1 |
ICE MOORING CONSTRUCTION METHOD IN ARCTIC CONDITIONS | 2019 |
|
RU2715034C1 |
COASTAL TERMINAL FOR LOADING/UNLOADING OF SHIPS AND METHOD FOR ITS ERECTION | 1995 |
|
RU2096555C1 |
METHOD TO EXPAND BERTHING FACILITIES AND TRANSHIPMENT BERTH | 2010 |
|
RU2459902C2 |
APPARATUS FOR PROVING AND MAINTAINING NON-FREEZING WATER AREA | 0 |
|
SU1030488A1 |
MOORING DEVICE FOR LIGHTER CARRIERS | 0 |
|
SU836274A1 |
Authors
Dates
2012-06-20—Published
2008-12-17—Filed