FIELD: oil and gas industry.
SUBSTANCE: opening and closing of shutoff-control valves of well cluster is performed by independent supply of working medium to actuators of shutoff-control valves and underground cutout valves in the specified sequence, as well as valves controlling the flow rate of each well. Method is implemented by means of control station mounted in the cabinet and including instrumentation and control, as well as hydraulic system. Hydraulic system includes pneumatic hydraulic pressure accumulators combined with working medium tank, pumps, pressure controls and multiplying gears, and has the possibility of controlling actuators of shutoff-control valves with time delay and in certain sequence. At that, in addition, control lines of loop and flare gate valves are mounted in cabinet of the station, which are installed on pipelines in close proximity to control cabinet, for example on one common frame.
EFFECT: invention simplifies mineral deposit production control process, as well as allows reducing the area occupied with process equipment.
21 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
OPERATING METHOD OF HYDROCARBON RAW MATERIAL DEPOSIT | 2010 |
|
RU2453685C1 |
METHOD OF CONTROLLING SHUTOFF AND CONTROL VALVES OF WELL CLUSTER AND DEVICE THEREFOR | 2017 |
|
RU2646901C1 |
WELL CLUSTER OF HYDROCARBON RAW MATERIAL DEPOSIT | 2010 |
|
RU2453684C1 |
WELL OF HYDROCARBON RAW MATERIAL DEPOSIT | 2010 |
|
RU2453687C1 |
CHRISTMAS TREE CONTROL CABINET | 2019 |
|
RU2726815C1 |
CHRISTMAS TREE CONTROL CABINET | 2019 |
|
RU2726813C1 |
X-TREE CONTROL METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2011 |
|
RU2453683C1 |
WELL TYING MODULE | 2019 |
|
RU2721564C1 |
BOREHOLE CONNECTION MODULE | 2019 |
|
RU2721573C1 |
METHOD OF CONTROL OVER CHRISTMAS TREES AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2362004C1 |
Authors
Dates
2012-06-20—Published
2010-11-18—Filed