FIELD: oil and gas industry.
SUBSTANCE: well of hydrocarbon raw material deposit, either gas one or gas-condensate one, includes production string with tubing string with underground operating equipment. Operating equipment includes at least a cutout valve with remote control, which is provided with an actuator, and well head with wellhead equipment. Wellhead equipment comprises casing head, tubing head on which there mounted is X-tree in the form of a fir tree, which includes shutoff members - master and side gate valves with actuators, as well as throttle valve adjacent to the latter, which controls the well flow rate and is provided with an actuator, and monitoring and control members - fuse insert and gas line pressure monitoring valve. Well is connected to control station by means of shutoff members, throttle valve and cutout valve. Control station is made in the form of a cabinet and includes pump accumulator plant and at least one control unit per well.
EFFECT: improving reliability and accident-free operation of gas well and simplifying the control of processes.
12 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
OPERATING METHOD OF HYDROCARBON RAW MATERIAL DEPOSIT | 2010 |
|
RU2453685C1 |
WELL CLUSTER OF HYDROCARBON RAW MATERIAL DEPOSIT | 2010 |
|
RU2453684C1 |
CONTROL METHOD OF SHUTOFF-CONTROL VALVES OF WELL CLUSTER, AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2453686C1 |
METHOD OF CONTROLLING SHUTOFF AND CONTROL VALVES OF WELL CLUSTER AND DEVICE THEREFOR | 2017 |
|
RU2646901C1 |
CHRISTMAS TREE CONTROL CABINET | 2019 |
|
RU2726815C1 |
CHRISTMAS TREE CONTROL CABINET | 2019 |
|
RU2726813C1 |
WELL TYING MODULE | 2019 |
|
RU2721564C1 |
BOREHOLE CONNECTION MODULE | 2019 |
|
RU2721573C1 |
X-TREE CONTROL METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2011 |
|
RU2453683C1 |
X-TREE CONTROL METHOD AND DEVICE THEREFOR | 2015 |
|
RU2596175C1 |
Authors
Dates
2012-06-20—Published
2010-11-18—Filed