FIELD: construction.
SUBSTANCE: surface layer is removed, the section is filled with a polymer concrete with binding fillers, further a flat U-shaped thermoplastic reinforcing element from plastic is inserted into the road bed body with a collar down, reinforced with a metal L-shaped bar and taken to the level of the surface layer. Such combination of used materials makes it possible to strengthen a damaged section of the road without application of bitumen-containing binding components as a binder, using at the same time standard and simple equipment and rigging.
EFFECT: strengthening and repair of a road bed, reduced labour intensiveness due to application of simple equipment and rigging, increased service life.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
ROAD PAVEMENT STRENGTHENING AND REPAIR METHOD | 2008 |
|
RU2381325C1 |
METHOD FOR CREATING SUPPORT STRUCTURE OF PAVEMENT | 2020 |
|
RU2747181C1 |
METHOD TO REPAIR ASPHALT-CONCRETE SURFACES | 2012 |
|
RU2501903C1 |
ROAD RECONSTRUCTION AND STRENGTHENING METHOD | 2008 |
|
RU2381324C2 |
METHOD OF STRENGTHENING ROAD BED OF AUTOMOBILE ROADS IN PLACES OF CULVERTS | 2015 |
|
RU2588250C1 |
CELL STRUCTURE OF ROAD BED | 2008 |
|
RU2360062C1 |
HONEYCOMB STRUCTURE OF ROAD BED | 2009 |
|
RU2392367C1 |
METHOD FOR FORMING REINFORCING LAYER OF ASPHALT CONCRETE PAVEMENT WITH METAL MESH | 2020 |
|
RU2763867C1 |
METHOD TO CONSTRUCT AND STRENGTHEN MOTOR ROADS | 2012 |
|
RU2493315C1 |
FUNCTIONAL JOINT OF REINFORCED CONCRETE FRAMEWORK OF BRIDGE AND PROCESS OF ITS INSTALLATION | 2000 |
|
RU2186900C2 |
Authors
Dates
2012-06-27—Published
2010-12-13—Filed