METHOD TO ASSEMBLE REINFORCEMENT RODS AND FRAMES MADE OF THEM Russian patent published in 2012 - IPC E04C5/16 

Abstract RU 2454517 C1

FIELD: construction.

SUBSTANCE: method to assemble reinforcement rods and frames is carried out with facilities and elements of connection. Reinforcement elements are joined by means of pressing. First that part of the connection coupling is pressed, where an appropriate rod is mounted: either a lower or an upper one, then a non-pressed rod is inserted into the coupling, and the second part of the coupling is pressed, at the same time lengths of coupling parts pressed in order of priority - the first and the second, are in a certain ratio. The version of the method to assemble reinforcement rods and frames provides for pressing of at least two connection couplings mounted either on the lower rods or the upper rods assembled into a frame system, besides, first that part of the coupling is pressed, where a rod is installed, and then non-pressed rods are simultaneously inserted in all couplings and are pressed, at the same time lengths of parts of each coupling pressed in order of priority - the first and the second, are in a certain ratio.

EFFECT: simplified process of reinforcement rods coupling, higher reliability and strength characteristics of a joint, increased labour intensiveness and reduced construction timing.

8 cl, 4 dwg

Similar patents RU2454517C1

Title Year Author Number
METHOD OF INSTALLING ARMATURE RODS 2017
  • Abramov Andrej Dmitrievich
  • Izhbuldin Evgenij Aleksandrovich
  • Banul Viktor Vladimirovich
RU2662740C1
UNIVERSAL HOUSE-BUILDING SYSTEM 2014
  • Khudyakov Sergej Aleksandrovich
  • Ajsvert Roman Vilgelmovich
  • Salvatore Porto
  • Dmitrusenko Mikhail Sergeevich
RU2585330C2
FRAMEWORK UNIVERSAL PREFABRICATED ARCHITECTURAL AND CONSTRUCTION SYSTEM 2016
  • Shpeter Aleksandr Karlovich
  • Semenyuk Pavel Nikolaevich
  • Ovsyannikov Sergej Nikolaevich
RU2634139C1
REINFORCEMENT OF VERTICAL PILES MADE IN SOIL AND PERCEIVING INDENTATION LOADS 2010
  • Eremin Valerij Jakovlevich
  • Eremin Aleksej Valer'Evich
  • Madatjan Sergej Ashotovich
  • Molchanov Kirill Dmitrievich
RU2465403C2
HYBRID PRECAST/CAST-IN-PLACE SPATIAL REINFORCED CONCRETE FRAME OF MULTI-STOREY BUILDING 2019
  • Blazhko Vladimir Pavlovich
  • Kharitonova Anastasiya Vladimirovna
RU2723110C1
CONNECTION ASSEMBLY FOR CONSTRUCTION REINFORCED CONCRETE ELEMENTS 2014
  • Khudjakov Sergej Aleksandrovich
  • Ajsvert Roman Vilgelmovich
  • Salvatore Porto
  • Dmitrusenko Mikhail Sergeevich
RU2581179C1
FRAME JOINT OF PREFABRICATED REINFORCED CONCRETE FRAMEWORK 2015
  • Kodysh Emil Nukhimovich
  • Trekin Nikolaj Nikolaevich
  • Kelasev Nikolaj Gennadievich
  • Bybka Aleksandr Vasilevich
RU2611134C1
INTERFLOOR CONNECTING ELEMENT FOR REINFORCED CONCRETE STRUCTURES 2023
  • Olenev Anatolij Anatolevich
RU2820372C1
METHOD FOR CONSTRUCTING A VERTICAL SLOPE OF A ROAD EMBANKMENT AND A RETAINING BLOCK FOR IMPLEMENTING SUCH A METHOD 2021
  • Ustyan Nagapet Amirkhanovich
RU2765408C1
LARGE-BLOCK MOUNTING MODULE AND METHOD OF ERECTION OF STRUCTURES FROM LARGE-BLOCK MOUNTING MODULES 2020
  • Anpilov Sergej Mikhajlovich
RU2735793C1

RU 2 454 517 C1

Authors

Romanov Oleg Danil'Evich

Suruda Vasilij Viktorovich

Malinin Igor' Vladimirovich

Dates

2012-06-27Published

2011-03-04Filed