FIELD: oil and gas production.
SUBSTANCE: method includes oil lifting by tubing with simultaneous cleaning by scraper and production process control with the aid of control station. According to the invention the tubing cleaning from asphalt, resin, and paraffin deposits is performed in the course of scraper descending-lifting. Note that the speed of produced fluid supply is increased up to the speed higher than the scraper speed during descending-lifting by means of decreasing the plant capacity before tubing cleaning operation by way of supply reduction at the input of electric-centrifugal pump with simultaneous provision of additional dynamic pressure in annulus. Note that in the course of scraper descending-lifting pump suction capacity is increased by means of decreasing of additionally accumulated dynamic level of produced fluid in the annulus by way of increasing the speed of fluid supplied into tubing to the speed not lower than the speed of scraper movement during cleaning, this allows the flow of produced fluid taking asphalt, resin, and paraffin deposits cut by the scraper to the surface preventing the formation of paraffin plug in the well.
EFFECT: increase of well productivity by means of increasing the efficiency of elevator column cleaning from asphalt, resin, and paraffin deposits and increasing of overhaul period of marginal producers.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF OIL EXTRACTION BY MEANS OF DOWN-PUMP WITH SIMULTANEOUS CLEANING OF TUBING STRING BY FLYING SCRAPER AND INSTALLATION FOR ITS IMPLEMENTATION | 2001 |
|
RU2217578C2 |
DEVICE FOR OIL GAS DISCHARGE FROM HOLE ANNUITY | 2003 |
|
RU2256779C1 |
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS | 2018 |
|
RU2676780C1 |
METHOD OF CONTROLLING FORMATION OF ASPHALTENE SEDIMENTS DURING PRODUCTION OF HIGH POUR POINT ANOMALOUS OIL | 2021 |
|
RU2766996C1 |
METHOD FOR PREVENTING DEPOSITS OF ASPHALT-RESINS AND PARAFFIN COMPONENTS OF OIL IN PUMP COMPRESSOR TUBES IN THE WELL AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2661951C1 |
METHOD FOR PETROLEUM PRODUCTION AND APPARATUS FOR IMPLEMENTATION THEREOF | 2021 |
|
RU2780982C1 |
PRODUCTION METHOD OF OIL WITH HIGH GAS FACTOR | 2020 |
|
RU2737805C1 |
METHOD FOR OPERATION OF PRODUCT WELL AND EQUIPMENT FOR REALIZATION OF SAID METHOD | 2004 |
|
RU2291957C2 |
METHOD FOR MECHANISED PUMP OPERATION OF WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2631517C1 |
METHOD OF ASPHALT-RESIN-PARAFFIN DEPOSITS FROM AN OIL WELL | 2018 |
|
RU2695724C1 |
Authors
Dates
2012-07-10—Published
2011-01-25—Filed