FIELD: oil production, cleaning of internal surface of tubing strings from wax-gum accumulation in process of operation of wells. SUBSTANCE: process of oil extraction by means of down-pump with flying scraper includes lift of oil over tubing string with their simultaneous cleaning by flying scraper under working mode, additional cleaning of tubing string by flying scraper during its downward stroke under its own weight to stop anchor, simultaneous lift of oil over production string under cleaning mode. Process is controlled with transfer of well to cleaning mode by opening of shut-off device in hole clearance line and closing of shut-off device in tubing string line with subsequent transfer of well to working mode after expiry of specified time interval by opening of shut-off device in tubing string line and closing of shut-off device in hole clearance line. Installation for extraction of oil by means of down-pump with simultaneous cleaning of tubing string by flying scraper includes tubing string and production string forming hole clearance. Internal space of tubing string communicates with hole clearance through overflow hole. Production string is equipped with shut-off device installed in hole clearance line. Packer is set in hole clearance below overflow hole. Control station has capability to open and close shut-off devices in tubing string line and in hole clearance line. Down-pump is positioned in tubing string below overflow hole. EFFECT: enhanced efficiency of extraction potential of wells and efficiency of their cleaning. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL PRODUCTION FROM WELL | 2011 |
|
RU2455465C1 |
TECHNIQUE OF CLEANING OF STRING OF TUBING STRING WHEN OIL IS PRODUCED BY MECHANIZED PROCESS | 1997 |
|
RU2157447C2 |
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS | 2018 |
|
RU2676780C1 |
BOREHOLE PUMP UNIT FOR SIMULTANEOUS OPERATION OF TWO BEDS WITH GAS BYPASS FROM UNDER PARKER SPACE (VERSIONS) | 2011 |
|
RU2464413C1 |
METHOD FOR SEALING A PRODUCTION STRING | 2017 |
|
RU2669646C1 |
METHOD OF OIL WELL OPERATION | 2014 |
|
RU2553689C1 |
METHOD AND DEVICE FOR FORMATION GEOMECHANICAL IMPACT | 2018 |
|
RU2680563C1 |
METHOD FOR HYDROCHLORIC ACID TREATMENT OF THE BOTTOM-HOLE ZONE OF AN OIL RESERVOIR | 2022 |
|
RU2792124C1 |
METHOD FOR MECHANISED PUMP OPERATION OF WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2631517C1 |
PROCEDURE FOR CLEANING PRODUCTION STRING AT CYCLIC MODE OF FLUID EXTRACTION AND CONTROL DEVICE FOR REALISATION OF THIS PROCEDURE | 2010 |
|
RU2415252C1 |
Authors
Dates
2003-11-27—Published
2001-12-21—Filed