FIELD: petroleum industry.
SUBSTANCE: invention relates to the petroleum industry and can be used in the operation of production flowing and mechanised boreholes. Claimed is a method for petroleum production including lifting the downhole products in the borehole, wherein acoustic waves are propagated into the tubing string (tubing) using an ultrasonic emitter, and the downhole products are degassed. When production of downhole products is terminated in the flowing mode, the downhole products are additionally lifted using a pump installed in the tubing below the ultrasonic emitter and a valve placed in the tubing above the pump, but below the ultrasonic emitter, and containing a central channel connecting the in-tube space zones of the tubing below and above the valve installation site and a side channel connecting the annular space of the tubing with the in-tube space of the tubing above the valve installation site. When the pump is operation, the central channel of the valve herein opens, and when the pump is put out of operation, the central channel of the valve closes, and the side channel of the valve opens. Also proposed is an apparatus for the implementation of the method.
EFFECT: higher production efficiency of downhole products and expanded scope of application of the method and the apparatus.
25 cl, 11 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ACOUSTIC ACTION ON FLOW OF LIQUID IN TUBING STRING WITH FEEDBACK CONTROL | 2018 |
|
RU2721614C2 |
DOWNHOLE VALVE DEVICE FOR AUTOMATIC FLOW SWITCHING | 2023 |
|
RU2821625C1 |
METHOD FOR PREVENTING DEPOSITS OF ASPHALT-RESINS AND PARAFFIN COMPONENTS OF OIL IN PUMP COMPRESSOR TUBES IN THE WELL AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2661951C1 |
METHOD FOR OPERATION OF DEPOSITS OF LIQUID MINERAL RESOURCES | 0 |
|
SU1630366A1 |
PROCEDURE FOR COMPLETION AND OPERATION OF WELL | 2009 |
|
RU2394978C1 |
METHOD FOR COMPLEX PRODUCTION OF HYDROCARBONS FROM OIL AND GAS CONDENSATE WELLS AND A SYSTEM FOR ITS IMPLEMENTATION | 2020 |
|
RU2756650C1 |
METHOD OF GARIPOV FOR OIL PRODUCTION AND DEVICE FOR ITS REALISATION | 2009 |
|
RU2405918C1 |
PHYSICAL EFFECT METHOD USED DURING DEVELOPMENT OF HYDROCARBON DEPOSIT, AND BORE-HOLE PLANT FOR METHOD'S REALISATION | 2007 |
|
RU2366806C1 |
METHOD OF DEVELOPMENT AND OPERATION OF WELLS WITH USE OF DISSOLVED GAS AND INSTALLATION OF INSTALLATION FOR IMPLEMENTATION THEREOF | 2018 |
|
RU2715008C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
Authors
Dates
2022-10-04—Published
2021-10-15—Filed