FIELD: construction.
SUBSTANCE: method to erect a pile foundation includes installation of piles and reinforcement of a near-pile soil by means of its reinforcement with a solution of a hardening material. Prior to installation of a pile a well is drilled with a diameter of not more than 1/3 of the pile diameter. The well is filled with a strengthening solution. The pile is submerged into the well filled with the strengthening solution to form a strengthened and a compacted zones under a foot and around the pile shaft, and such zones are shaped as a hemisphere below with a truncated cone above, besides, the strengthened zone reinforced with the strengthening solution and arranged in the volume of the compacted zone is adjacent to the pile.
EFFECT: increased efficiency of soil strengthening around a pile, higher bearing capacity of piles, reduced labour intensiveness and material intensity.
3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INSTALLATION OF PILES ON MACROPOROUS SOILS | 2022 |
|
RU2800801C1 |
METHOD FOR PILE CONSTRUCTION IN MACRO-POROUS SOILS | 2020 |
|
RU2753295C1 |
METHOD OF INCREASING BEARING STRENGTH OF PILING | 2007 |
|
RU2379419C2 |
METHOD FOR CONSTRUCTION OF PILE FOUNDATION | 0 |
|
SU1678976A1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
METHOD OF PILE DRIVE DEVICE | 2014 |
|
RU2601630C2 |
METHOD FOR ERECTION OF DRIVEN PILE | 2022 |
|
RU2787049C1 |
METHOD OF COMBINED IN SITU PILE MANUFACTURING | 2007 |
|
RU2334049C1 |
METHOD FOR SOIL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2588511C2 |
METHOD OF MANUFACTURING OF CHIPPING IN SITU PILE | 2007 |
|
RU2338032C1 |
Authors
Dates
2012-07-20—Published
2011-02-17—Filed