FIELD: oil and gas industry.
SUBSTANCE: water influx isolation method involves installation of process shield using the solution containing Mikrodur RU, Sulfatsell, ethylene glycol and water at water-cement ratio of 0.8-0.9. Installation of the above shield is performed in terrigenous formation which is by 5-10 m higher than oil-water contact on the basis of 0.5-2.0 m3 per 1 m of effective formation thickness at the following component ratio, wt %: Mikrodur RU 51.7-54.6, Sulfatsell 0.6, ethylene glycol 1.1, and water 43.7-46.6.
EFFECT: improving bottom water insulation, providing the reduction of water content of wells during development of oil and gas deposits.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
BOTTOM WATER ISOLATION METHOD | 2013 |
|
RU2569941C2 |
METHOD TO RECOVER TIGHTNESS OF PRODUCTION COLUMN | 2011 |
|
RU2463436C1 |
METHOD OF SEALING RECOVERY OF PRODUCTION STRING | 2010 |
|
RU2455458C1 |
METHOD ON INFLOW ISOLATION OF BOTTOM WATER IN WELL | 2014 |
|
RU2564704C1 |
METHOD FOR LIMITING WATER INFLUX IN PRODUCTION WELL | 2011 |
|
RU2477789C1 |
COMPOSITION FOR REMEDIAL CEMENTING IN WELLS | 2015 |
|
RU2613067C1 |
METHOD FOR ISOLATION OF BOTTOM WATER INFLOW IN OIL WELLS | 2015 |
|
RU2588582C1 |
METHOD OF BOTTOM WATER CONE CUTTING | 2016 |
|
RU2655490C2 |
METHOD OF ISOLATION OF WATER SUPPLY IN OIL-EXTRACTING WELL | 2017 |
|
RU2655495C1 |
METHOD FOR RESTRICTING BOTTOM WATER AND ANNULUS BLOWOUTS IN PRODUCTION WELLS | 2000 |
|
RU2172825C1 |
Authors
Dates
2012-07-20—Published
2010-12-30—Filed