FIELD: oil-and-gas production.
SUBSTANCE: proposed method consists in arranging 5-10 m-high sand bridging plug in well below production strip defect and above perforation. Then, solution of Portland cement "ПЦТ" 1-50, Microdur RU with water-to-cement ratio of 0.8-0.9 in amount of 0.5-2.0 m3 per 1 m of the bed effective thickness at the following ratio of components: Portland cement "ПЦТ" 1-50 - 26.1-27.5, Microdur RU - 26.0-27.4, sulphacell - 1.0-1.1, water - 44.0-46.9.
EFFECT: higher reliability of insulation in eliminating production string uptightness.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SEALING RECOVERY OF PRODUCTION STRING | 2010 |
|
RU2455458C1 |
WATER INFLUX ISOLATION METHOD | 2010 |
|
RU2456431C1 |
BOTTOM WATER ISOLATION METHOD | 2013 |
|
RU2569941C2 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRINGS | 2009 |
|
RU2416020C1 |
RESTORING METHOD OF SEALING OF CASING STRINGS | 2011 |
|
RU2471963C1 |
METHOD ON INFLOW ISOLATION OF BOTTOM WATER IN WELL | 2014 |
|
RU2564704C1 |
WELL INTERVENTION COMPOSITION | 2006 |
|
RU2326922C1 |
METHOD OF WELL PROBLEM SECTIONS ELIMINATION | 2014 |
|
RU2555686C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
INSULATION METHOD OF WATER INFLUX AND WELL THIEF ZONE | 2008 |
|
RU2378490C1 |
Authors
Dates
2012-10-10—Published
2011-03-21—Filed