FIELD: oil and gas production.
SUBSTANCE: sand bridging is installed before injection in the well below the defect of production string and cement bridging 5-10 m is installed above the perforation interval. The oil is injected through tubing on the basis 2 m per 1 m of the strata net thickness and water is forced out of the insulation zone. After that the solution of Mikrodur R-U with sulfatsell is pumped in with water-cement ratio 0.8-0.9 on the basis of 0.5-2.0 m per 1 m of the strata net thickness with the following component ratio, wt %: Mikrodur R-U 51.4-54.9; sulfatsell 2.3-1.1; water 46.3-44.0.
EFFECT: increase of insulation reliability in case of sealing failure of production string, reduction of insulating works period.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD TO RECOVER TIGHTNESS OF PRODUCTION COLUMN | 2011 |
|
RU2463436C1 |
WATER INFLUX ISOLATION METHOD | 2010 |
|
RU2456431C1 |
BOTTOM WATER ISOLATION METHOD | 2013 |
|
RU2569941C2 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRINGS | 2009 |
|
RU2416020C1 |
WELL INTERVENTION COMPOSITION | 2006 |
|
RU2326922C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN PETROLEUM PRODUCTION BOREHOLES | 2021 |
|
RU2774251C1 |
METHOD OF WELL PROBLEM SECTIONS ELIMINATION | 2014 |
|
RU2555686C1 |
METHOD ON INFLOW ISOLATION OF BOTTOM WATER IN WELL | 2014 |
|
RU2564704C1 |
COMPOSITION FOR REMEDIAL CEMENTING IN WELLS | 2015 |
|
RU2613067C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
Authors
Dates
2012-07-10—Published
2010-12-13—Filed