DRILLING INFRASTRUCTURE FOR COMBINED WORK Russian patent published in 2012 - IPC E21B47/12 H04L12/24 

Abstract RU 2457325 C2

FIELD: oil and gas industry.

SUBSTANCE: method of simplification the collective work between the users at drill site and users at remote location consists of the following stages: many types of oil well data are collected at drill site for aggregated data formation; aggregated data is converted into standard format; aggregated data is saved on data aggregation server at drill site in standard format. Note that data aggregation server has data storage that has a set of analytical tools configured for aggregated data analysis. Oil well data is compared to the data description referred to it, compared data is saved in knowledge base at the drill site. Note that the compared data is used for conversion of unknown data of oil well into the standard format. The copy of aggregated data and compared data is saved on local server in remote location. Note that the local server stores the mirror copy of the data that is stored at data aggregation server. Note that the user at drill site can access the aggregated data and analyse them with the aid of a set of analytical tools at data aggregation server. The user in remote location can access the aggregated data saved at local server as well as analyse them with the aid of a set of analytical tools.

EFFECT: increase of efficiency of working processes control between the users at drill site and users in remote location.

25 cl, 16 dwg

Similar patents RU2457325C2

Title Year Author Number
ADAPTIVE CONTROL SYSTEM FOR WELLS DRILLING BASED ON A SINGLE DIGITAL PLATFORM 2019
  • Kulchitskij Valerij Vladimirovich
  • Parkhomenko Artem Konstantinovich
  • Ilichev Stanislav Alekseevich
  • Aleksandrov Vadim Leonidovich
  • Shchebetov Aleksej Valerevich
RU2703576C1
PREDICTING PROPERTIES OF UNDERGROUND FORMATION 2008
  • Priezzhev Ivan Ivanovich
  • Shmar'Jan Leonid Evgen'Evich
  • Bejarano Gaston
RU2462755C2
SYSTEM AND METHOD OF DRILLING AT OIL DEPOSITS 2008
  • Repin Dmitrij Gennad'Evich
  • Singkh Vivek
  • Chehpman Klinton
  • Brehnnigan Dzhim
RU2452855C2
METHOD OF FORMATION BREAKDOWN SIMULATION AND ITS ESTIMATION, AND COMPUTER-READ CARRIER 2008
  • Fittspatrik Ehntoni
  • Ounaissa Khajtem
RU2486336C2
SYSTEM AND PROCEDURE FOR DRILLING OPERATION AT DEPOSIT 2008
  • Nikolakis-Mukhas Khristos
  • Singkh Vivek
  • Repin Dmitrij
  • Chehpman Klinton
RU2436947C2
DEVICE, METHOD AND SYSTEM OF STOCHASTIC INVESTIGATION OF FORMATION AT OIL-FIELD OPERATIONS 2008
  • Graf Tomas
  • Tsangl Georg
RU2496972C2
SIMULATION OF BOTTOM-HOLE ASSEMBLY/DRILLING STRING TRANSIENT MODE DURING DRILLING 2008
  • Pejbon Dzheir
  • Uiks Natan
  • Chan Jun
  • Chehpman Klinton
  • Singkh Vivek
RU2461707C2
METHOD AND SYSTEM FOR DATA CONTEXT SERVICE 2008
  • Braussard Flojd
  • Abusalbi Nadzhib
RU2493590C2
DETERMINING POSITION OF GEOLOGIC HORIZON RELATIVE TO MANIFESTATION OF SEISMIC PULSE IN SEISMIC DATA 2011
  • Pirl' Tomas Ehndrju
RU2570221C2
SIMULTANEOUS OPERATIONS COORDINATION AND PLANNING SYSTEM 2015
  • Grant, John
  • Darling, Stuart
  • Cameron, Scott
  • Gentle, Dave
RU2668835C2

RU 2 457 325 C2

Authors

Karr Dzhordzh

Fleri Simon

Landgren Ken

Shou Kevin

Dates

2012-07-27Published

2008-02-25Filed