FIELD: mining.
SUBSTANCE: connecting survey method is implemented in the following way: one downward shaft scanning travel determines a) plane coordinates (X, Y) of one and/or more points of the surveying underground network in the coordinate system accepted on the surface; b) orientation of underground horizons - transfer of direction angle from surface to the well; c) absolute height point (Z coordinate) of points of underground surveying network in mine workings in the coordinate system which is common with the surface.
EFFECT: improvement of prompt transfer of the specified coordinates and direction angle from day surface to underground mine workings at maintaining high accuracy.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
ARRANGEMENT FOR TRANSFER OF THE DIRECTION OF UNDERGROUND MINE WORKINGS FROM LEVEL TO LEVEL THROUGH CONNECTION CHANNEL | 0 |
|
SU1138496A1 |
METHOD OF UNSIGHTED HORIZONTAL INSTRUMENTAL SURVEY OF SUBLEVELS USING AN ELECTRONIC TACHEOMETER | 2020 |
|
RU2736698C1 |
METHOD OF HORIZONTAL CONNECTING SHOOTING OF SUBSURFACE HORIZONS | 2018 |
|
RU2677089C1 |
DEVICE FOR ORIENTATION OF UNDERGROUND MINING DEVELOPMENTS | 2017 |
|
RU2662468C1 |
DEVICE FOR PROJECTING DIRECTION ANGLE FROM DAY SURFACE TO UNDERGROUND HORIZON | 0 |
|
SU1190196A1 |
PROCESS FOR TRANSMITTING ASIMUTH AND COORDINATES TO UNDERGROUND MINING WORKING | 0 |
|
SU1128293A1 |
MINE SHAFT PROFILING STATION | 2021 |
|
RU2763151C1 |
METHOD OF ORIENTING SUBLEVEL WORKING VIA ONE VERTICAL OPENING | 0 |
|
SU1469354A1 |
DEVICE TRANSMITTING COORDINATES | 1994 |
|
RU2092793C1 |
0 |
|
SU1781542A1 |
Authors
Dates
2012-08-10—Published
2011-02-21—Filed