FIELD: information technologies.
SUBSTANCE: method to synchronise upperlink frames in a subscriber station may include stages, at which the first time mark is recorded, corresponding to the first frame of the downlink, and the second time mark is recorded, corresponding to the second frame of the downlink. The first time mark and the second time mark may be used to determine a change in a distribution delay. Timing of transfer along an upperlink may be regulated on the basis of a change in a distribution delay, which is identified.
EFFECT: improved accuracy of frame synchronisation.
39 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
USE OF TIMING ADVANCE COMMAND IN WIRELESS COMMUNICATION DEVICE IN EXTENDED COVERAGE MODE | 2017 |
|
RU2702893C1 |
EQUIPMENT AND METHOD FOR SYNCHRONISING USING A WIRELESS COMMUNICATION NETWORK IN A WIRELESS COMMUNICATION SYSTEM | 2019 |
|
RU2777434C1 |
HANDOVER IN WIRELESS COMMUNICATION | 2017 |
|
RU2751675C2 |
METHOD AND APPARATUS FACILITATING TIMING ALIGNMENT IN MULTICARRIER SYSTEM | 2010 |
|
RU2521964C2 |
METHOD AND DEVICE TO PROCESS PRIMARY AND SECONDARY SIGNALS OF SYNCHRONISATION FOR WIRELESS COMMUNICATION | 2011 |
|
RU2491784C1 |
BASE STATION DEVICE AND TRANSMISSION METHOD | 2010 |
|
RU2529556C2 |
METHOD AND APPARATUS FOR MEASURING ROUND-TRIP DELAY IN MOBILE STATION | 2009 |
|
RU2463741C2 |
METHODS AND SYSTEMS FOR SUBSCRIBER STATION-BASED ADMISSION CONTROL | 2009 |
|
RU2518376C2 |
DEVICE AND METHOD FOR SUPPORTING RELAY SERVICE IN BROADBAND WIRELESS ACCESS COMMUNICATION SYSTEM WITH MULTIPLE RELAY STEPS | 2007 |
|
RU2394384C2 |
METHOD FOR CONTROLLING SIGNAL PROPAGATION DELAY | 1997 |
|
RU2195076C2 |
Authors
Dates
2012-08-20—Published
2009-03-03—Filed