FIELD: construction.
SUBSTANCE: method for well construction includes rotation and axial feed of a layout with a chisel and supply of a drilling mud via an inner cavity of the layout for landing, lowering and cementing of a casing string. Drilling is carried out with application of a hydraulic downhole motor, when a zenith angle of more than 25° is reached, and there is a risk of drill string sticking prior to the drill string build-up, a pack of the drilling mud base is squeezed into a bottomhole area with zero content of a weighting agent and a solid phase with density of 1000-1010 kg/m3 in the volume of 8-12 m3, the annular space is sealed, and 0.5-1 m3 of the drilling mud base pack is squeezed into the bottomhole area with the wellhead pressure of not more than 3 MPa and the flow from 10 to 16 l/s, soaked for not more than 1 minute, the pressure is released, and the drill string is built up, circulation of the drilling mud is recovered, drilling continues with the drilling mud, during the subsequent building-up of the drill string the operations are repeated.
EFFECT: invention provides for drilling of wells with a high zenith angle without sticking of a drill string during its build-up.
1 ex
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD FOR WELL DRILLING | 2012 | 
 | RU2478768C1 | 
| METHOD OF WELL OPERATION | 2011 | 
 | RU2453674C1 | 
| WELL CONSTRUCTION METHOD | 2014 | 
 | RU2541978C1 | 
| WELL DRILLING METHOD | 2014 | 
 | RU2557029C1 | 
| METHOD OF WELL DRILLING | 2016 | 
 | RU2606998C1 | 
| METHOD FOR WELL CONSTRUCTION | 2012 | 
 | RU2494214C1 | 
| METHOD FOR DRILLING WELL ON PRESSURE DRAWDOWN | 2005 | 
 | RU2287660C1 | 
| PROCEDURE FOR CONSTRUCTION OF HORIZONTAL WELL IN DEVONIAN STRATA | 2009 | 
 | RU2421586C1 | 
| METHOD FOR WELL DRILLING | 2012 | 
 | RU2478769C1 | 
| METHOD FOR ISOLATION OF THIEF ZONE DURING WELL DRILLING | 2015 | 
 | RU2588074C1 | 
Authors
Dates
2012-08-27—Published
2011-10-20—Filed