FIELD: mining.
SUBSTANCE: method consists in rotation and internal feed of composition with a chisel and mud feed through the composition shank bore down the place for lifting and case hardening. Drilling is performed by means of hydraulic downhole motor. Upon reaching a zenith angle of 25° and at risk of sidewall sticking, at regular intervals of 0.5-1.5 hours, the drill string reciprocation to the drill tube's dimension plus 1.0-2.5 m with the simultaneous drill string rotation in a range of 20-40 r/m is carried out. For this purpose, the drilling fluid with density of 1.0-1.4 g/cm3 is used, and circulation rate is set in a range of 16-45 l/s.
EFFECT: invention ensures well-drilling without sidewall sticking.
1 dwg, 1 ex
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF WELL DRILLING | 2016 | 
 | RU2606998C1 | 
| WELL CONSTRUCTION METHOD | 2014 | 
 | RU2541978C1 | 
| METHOD FOR WELL DRILLING | 2012 | 
 | RU2478768C1 | 
| METHOD FOR WELL CONSTRUCTION | 2011 | 
 | RU2459922C1 | 
| PROCEDURE FOR CONSTRUCTION OF HORIZONTAL WELL IN DEVONIAN STRATA | 2009 | 
 | RU2421586C1 | 
| METHOD FOR WELL CONSTRUCTION | 2012 | 
 | RU2494214C1 | 
| CONSTRUCTION OF OIL PRODUCTION WELL | 2013 | 
 | RU2524089C1 | 
| CONSTRUCTION METHOD OF WELL SHAFT THROUGH UNSTABLE CLAY MINE ROCKS | 2012 | 
 | RU2474669C1 | 
| WELL COMPLETION METHOD | 2018 | 
 | RU2723815C1 | 
| WELL CONSTRUCTION METHOD | 2018 | 
 | RU2723814C2 | 
Authors
Dates
2012-06-20—Published
2011-09-19—Filed