FIELD: oil and gas industry.
SUBSTANCE: according to the method working agent is pumped through injection wells, oil is extracted through production wells and insulation works are performed in production wells. According to invention, in order to perform water-insulation works there chosen are production wells in which watering-out of extracted products has increased with current water-oil of less than 8, with fluid rate of not less than 10 m3/day, water-intake rate of not less than 100 m3/day at mined oil-saturated thickness of productive layer of not less than 3 m and at stable operating mode of not less than 1.5 months. Besides, injection wells shall have influence coefficient of not less than 0.4 and be in stable operation for at least 1.5 months. Polymer systems hardened in formation conditions so that polymer gels are created are chosen as material for waterproof works.
EFFECT: higher efficiency of insulation works; reduction of extracted product watering-out.
2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INCREASING OIL RECOVERY OF FORMATIONS | 2024 |
|
RU2820950C1 |
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS WITH WATER OIL ZONES | 2015 |
|
RU2578134C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2124120C1 |
METHOD TO DEVELOP OIL POLL WITH OIL-IN-WATER SYSTEMS | 2009 |
|
RU2387812C1 |
METHOD FOR OIL FIELD DEVELOPMENT | 2007 |
|
RU2317411C1 |
METHOD OF OIL FIELD DEVELOPMENT WITH HORIZONTAL WELLS | 2014 |
|
RU2550642C1 |
DEVELOPMENT METHOD OF OIL FIELD WITH WATER-OIL ZONES | 2009 |
|
RU2386795C1 |
METHOD FOR INCREASING OIL RECOVERY OF DEPOSIT IN CARBONATE RESERVOIRS OF FRACTURE-PORE TYPE | 2011 |
|
RU2482269C2 |
METHOD FOR UNIFORM EXTRACTION STRATIFIED RESERVOIR | 2015 |
|
RU2597596C1 |
METHOD FOR FURTHER OIL FIELD DEVELOPMENT (VARIANTS) | 2004 |
|
RU2273728C1 |
Authors
Dates
2012-08-27—Published
2011-10-31—Filed