FIELD: construction.
SUBSTANCE: mosaic hardening of damaged sections 2 of blanket deposits 1 is done with low-grade oil. Strengthened sections 2 are additionally fixed to lower layers with hollow anchors 3 from a thermally oxidated soil. Cavities 4 of anchors 3 are filled with substances that are biologically acceptable for reclamation works, seeds of perennial herbs, plant seedlings 5. Along the perimetre of each section 2 snow-retaining borders 6 are erected from a thermally oxidated soil.
EFFECT: method makes it possible to reduce volumes and timing of reclamation works.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECULTIVATION OF EARTH CONSTRUCTION IN THE FAR NORTH | 2002 |
|
RU2216889C2 |
METHOD TO ERECT DIKE DAM ON ARCTIC SEA SHORE | 2011 |
|
RU2453653C1 |
SUBTERRANEAN-SLURRY MIXTURE FOR RECLAMATION LAND AND METHOD OF SOIL RECULTIVATION USING MENTIONED ABOVE MIXTURE | 2015 |
|
RU2631391C2 |
TECHNOGENIC SOIL AND METHOD FOR PRODUCTION THEREOF | 2019 |
|
RU2717250C1 |
ROAD STRUCTURE | 2006 |
|
RU2312181C1 |
ECO-FRIENDLY ROCK DUMP | 2022 |
|
RU2794684C1 |
BURIAL OF INDUSTRIAL WASTES | 2013 |
|
RU2539141C1 |
CONSTRUCTION MATERIAL RESOIL | 2015 |
|
RU2593289C1 |
METHOD FOR PROTECTION OF LANDS OF COASTAL RIVER LANDSCAPES | 2012 |
|
RU2492292C1 |
METHOD OF TAILING DUMPS RECLAMATION | 2017 |
|
RU2643038C1 |
Authors
Dates
2012-09-10—Published
2011-01-12—Filed