FIELD: mining.
SUBSTANCE: method involves creation of the main and additional water flows, obtaining of hydraulic fluid flow after addition of elements of natural resources of underwater deposits as part of rock mass to the main water flow and transportation of hydraulic fluid flow. Besides, increase in operation efficiency of transportation process of mineral resources of underground deposits is provided from high depths in process chain of development of underwater deposits of mineral resources due to stabilisation of concentration value of solid particles in hydraulic fluid flow that is transported from multi-purpose system for continuous collection of mineral resources of underwater deposits to base floating means located on water reservoir surface, at rational configuration of technical means.
EFFECT: stabilisation of concentration value of solid particles in hydraulic fluid flow.
3 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
ENVIRONMENTAL SEPARATION METHOD IN AIRLIFTING OF SUBMERSIBLE DEPOSITS OF MINERALS AND ITS IMPLEMENTATION SYSTEM | 2005 |
|
RU2324055C2 |
MARINE AIRLIFT OPERATION METHOD AND SYSTEM | 2005 |
|
RU2321748C2 |
ELECTRIC POWER SUPPLY METHOD AND SYSTEM FOR UNDERWATER MINERAL MINING TECHNIQUE | 2005 |
|
RU2321747C2 |
METHOD OF OPERATION OF HYDRAULIC TRANSPORTATION PLANT AND DEVICE FOR IMPLANTING THE METHOD | 2005 |
|
RU2310097C2 |
METHOD OF AND DEVICE FOR TRANSPORTATION OF HYDRAULIC MIXTURE FROM DEEP DEPTHS | 2005 |
|
RU2310099C2 |
METHOD FOR LIFTING MULTI-COMPONENT MIXTURE FROM HIGH DEPTHS AND SYSTEM FOR REALIZATION OF THE METHOD | 2005 |
|
RU2310102C2 |
METHOD OF AND DEVICE FOR LIFTING HYDRAULIC MIXTURE FROM DEEP DEPTHS | 2005 |
|
RU2310098C2 |
METHOD FOR STARTING AND OPERATING OF OFFSHORE AIRLIFT AND SYSTEM FOR ITS IMPLEMENTATION | 2007 |
|
RU2346160C2 |
DEEP-WATER AIRLIFT START-UP METHODS | 2009 |
|
RU2471071C2 |
SET OF MECHANICAL AND HYDRAULIC RECULTIVATION OF DISTURBED LANDS | 2014 |
|
RU2569145C1 |
Authors
Dates
2012-09-10—Published
2008-10-16—Filed