FIELD: information technology.
SUBSTANCE: knapsack problem solving device has a clock pulse generator, a resolution flip-flop, a result ready flip-flop, a group of m counters, a group of m first, second and third registers, fourth and fifth registers, a group of m sixth, seventh and eighth registers, a ninth register, first and second adders, a group of m third and fourth adders, first and second comparator circuits, a group of m third comparator circuits, an AND element, a startup input of the device, a reset input of the device, a first output of the device, a group of m second outputs of the device, third outputs of the device, fourth outputs of the device.
EFFECT: reduced hardware expenses, faster operation of the device, broader functional capabilities, specifically possibility of calculating the final weight of a set of objects, as well as the possibility of setting the allowed number of objects in each group of objects.
1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR SOLVING LINEAR INTEGER PROGRAMMING PROBLEMS | 2013 |
|
RU2518998C1 |
DEVICE TO MODEL SCHEDULE OF ENTERPRISE EMPLOYEES WORK | 2013 |
|
RU2526005C1 |
DEVICE FOR SOLVING BACKPACK PROBLEM | 2015 |
|
RU2613854C1 |
ALLOCATION PROBLEM SOLVING DEVICE | 2012 |
|
RU2511412C1 |
DEVICE TO SOLVE KNAPSACK PROBLEM | 2014 |
|
RU2542661C1 |
DEVICE FOR DETECTING GROUPS OF BITS IN A BINARY SEQUENCE | 2020 |
|
RU2728957C1 |
DEVICE FOR THE KNAPSACK PROBLEM SOLUTION | 2010 |
|
RU2443013C1 |
KNAPSACK PROBLEM SOLVING APPARATUS | 2009 |
|
RU2413287C2 |
APPARATUS FOR SIMULATING STAFF WORK SCHEDULE | 2010 |
|
RU2434273C1 |
DEVICE TO MODEL WORK SCHEDULE OF ENTERPRISE EMPLOYEES | 2011 |
|
RU2480827C1 |
Authors
Dates
2012-09-10—Published
2011-05-25—Filed