FIELD: electricity.
SUBSTANCE: device comprises a clock pulse generator, the first delay element, a group of serially connected counters, a trigger matrix, a matrix of groups of third AND elements, a group of the first summators, a group of the first comparison circuits, a group of the first registers, the fourth AND element, m groups of fifth AND elements, a group of second registers, the second summator, the second circuit of comparison, the third register, the second delay element, a group of sixth AND elements.
EFFECT: reduced time for detection of optical work schedules of employees.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
APPARATUS FOR SIMULATING STAFF WORK SCHEDULE | 2010 |
|
RU2434273C1 |
DEVICE FOR SOLVING APPOINTMENT PROBLEMS | 2016 |
|
RU2613523C1 |
APPARATUS FOR SIMULATING THE SCHEDULE OF EMPLOYEES OF AN INSTITUTION | 2018 |
|
RU2685980C1 |
DEVICE TO MODEL SCHEDULE OF ENTERPRISE EMPLOYEES WORK | 2013 |
|
RU2526005C1 |
DEVICE FOR FORMING THE POTENTIAL OF AN INNOVATION PROJECT | 2017 |
|
RU2669071C1 |
DEVICE FOR SOLVING PROBLEM OF WORK ALLOCATION FOR EXECUTORS | 2017 |
|
RU2665305C1 |
DEVICE FOR MODELLING COMPUTER NETWORK PROTECTION SYSTEM | 2007 |
|
RU2335016C1 |
APPARATUS FOR MODELLING THE WORK SCHEDULE OF EMPLOYEES OF AN INSTITUTION | 2022 |
|
RU2788323C1 |
ALLOCATION PROBLEM SOLVING DEVICE | 2012 |
|
RU2511412C1 |
APPARATUS FOR QUANTITATIVE ESTIMATION OF QUALITY INDICATOR | 2013 |
|
RU2520390C1 |
Authors
Dates
2013-04-27—Published
2011-11-15—Filed