FIELD: oil and gas production.
SUBSTANCE: method of servicing borehole in underground formation comprises the following operations. Preparing cement composition containing water cementing material including vitrified shale and fitting said composition into borehole. Note here that said underground formation contains permafrost, gas hydrates or both. In compliance with one version, cementing material represents blast-furnace slag, vitrified shale, potassium sulphate hemihydrate or combination thereof. In compliance with another version, proposed method comprises: preparing cement composition containing water cementing material including vitrified shale and fitting said composition into borehole. Hardening retarder represents sodium citrate. Note here that said underground formation contains permafrost, gas hydrates or both. Cement composition of water cementing material including vitrified shale and blast-furnace slag and/or potassium sulphate hemihydrate and fitting said composition into borehole. Note here that said underground formation contains permafrost, gas hydrates or both. Note also that ratio between said blast-furnace slag and/or potassium sulphate hemihydrate varies from 1:4 to 4:1.
EFFECT: reduced heat hydration.
17 cl, 6 ex, 7 tbl
Title | Year | Author | Number |
---|---|---|---|
CEMENTS FOR USE IN FORMATIONS CONTAINING GAS HYDRATES | 2007 |
|
RU2442878C2 |
CONTROLLING HEAT OF HYDRATION BY DETERMINING CHARACTERISTICS OF BINDING COMPONENTS | 2017 |
|
RU2733765C1 |
COMPOSITIONS CONTAINING FURNACE DUST AND WOLLASTONITE AND METHODS FOR USING THEREOF IN UNDERGROUND FORMATIONS | 2014 |
|
RU2640621C2 |
REACTION ABILITY MAPPING | 2017 |
|
RU2728648C1 |
SOLIDIFYING COMPOSITIONS CONTAINING NATURAL PUZZOLANA AND METHOD RELATED THEREWITH | 2010 |
|
RU2507379C2 |
USE OF CSH SUSPENSIONS IN CEMENTING OF WELLS | 2011 |
|
RU2598945C2 |
ACTIVATORS FOR HARDENING CEMENT FOR CEMENT COMPOSITIONS WITH DISABLED HARDENING AND RELATED METHODS | 2014 |
|
RU2637347C2 |
METHOD FOR PIPE STRING CEMENTING | 2013 |
|
RU2566836C2 |
COMPOSITION SETTING WITH INCREASED TIME OF PUMPING | 2015 |
|
RU2601953C1 |
SLAKED LIME FLUIDITY IN COMPOSITIONS WITH DELAYED SETTING AND OTHER COMPOSITION CAPABLE OF SOLIDIFYING | 2013 |
|
RU2621818C1 |
Authors
Dates
2012-10-20—Published
2007-03-21—Filed