FIELD: oil and gas production.
SUBSTANCE: proposed method consists in using tubing incorporating borehole pump and packer. Note here that borehole pump is equipped with check valve. Check valve is arranged close to and above the pump on tubing outer side to allow one-way fluid flow from tubing into tube space. Said tube space is filled with process fluid with corrosion inhibitor in required concentration. Pressure in tube space is maintained not exceeding tolerable magnitude by means of electric-contact pressure gage connected to borehole pump control unit. Reagent if injected into tubing from wellhead with tube space gate valve.
EFFECT: efficient injection, safe production of oil or gas.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
FLUSHING METHOD OF WELL SUBMERSIBLE ELECTRIC-CENTRIFUGAL PUMP BY REAGENT | 2011 |
|
RU2475628C1 |
METHOD FOR REMOVING DEPOSITS FROM BORE-HOLE PUMP AND FLOW COLUMN | 2010 |
|
RU2445449C1 |
METHOD FOR REMOVING DEPOSITS FROM BORE-HOLE PUMP AND FLOW COLUMN | 2010 |
|
RU2445448C1 |
FLUSHING METHOD OF WELL SUBMERSIBLE ELECTRIC CENTRIFUGAL PUMP | 2012 |
|
RU2513889C1 |
METHOD OF EVALUATION OF DEPOSIT VOLUME IN WELL FLOW COLUMN | 2011 |
|
RU2457324C1 |
DIAGNOSTICS METHOD OF DARP LOCATION IN WELL | 2019 |
|
RU2703552C1 |
DEVICE TO CLEAN TUBING OF SEDIMENTS | 2010 |
|
RU2452850C1 |
METHOD OF DELIVERING A SOLVENT IN A WELL | 2019 |
|
RU2709921C1 |
METHOD OF FLOW COLUMN CLEANING FROM ASPHALT-TAR-PARAFFIN DEPOSITS | 2012 |
|
RU2495232C1 |
METHOD FOR REMOVING OF DEPOSITS FROM FLOW COLUMN OF OIL WELLS | 2016 |
|
RU2610946C1 |
Authors
Dates
2012-10-20—Published
2011-04-07—Filed