FIELD: oil and gas industry.
SUBSTANCE: during this method implementation reagent is supplied to pump cavity through check three-position valve installed above vent hole of pump. Delivery and accumulation of reagent is performed in tubing through flexible reinforced pipe lowered from wellhead for the period of treatment or previously installed fixed inside tubing string or along inter-tube space of well. Accumulated volume of reagent above the pump and check valve is forced in the pump through check three-position valve by generation of required pressure differential in tubing string from wellhead for check three-position valve opening in backward direction.
EFFECT: improving efficiency of pump flushing method.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
FLUSHING METHOD OF WELL SUBMERSIBLE ELECTRIC CENTRIFUGAL PUMP | 2012 |
|
RU2513889C1 |
METHOD OF FEEDING REAGENT INTO WELL TUBING | 2011 |
|
RU2464409C1 |
METHOD FOR REMOVING DEPOSITS FROM BORE-HOLE PUMP AND FLOW COLUMN | 2010 |
|
RU2445449C1 |
METHOD OF EVALUATION OF DEPOSIT VOLUME IN WELL FLOW COLUMN | 2011 |
|
RU2457324C1 |
DOWNHOLE ELECTRICALLY-DRIVEN ROTARY PUMP UNIT PROTECTION | 2014 |
|
RU2573613C1 |
METHOD OF DELIVERING A SOLVENT IN A WELL | 2019 |
|
RU2709921C1 |
DIAGNOSTICS METHOD OF DARP LOCATION IN WELL | 2019 |
|
RU2703552C1 |
METHOD OF FLOW COLUMN CLEANING FROM ASPHALT-TAR-PARAFFIN DEPOSITS | 2012 |
|
RU2495232C1 |
METHOD OF DETERMINATION OF DEPOSIT VOLUME IN TUBING STRING | 2015 |
|
RU2610948C1 |
METHOD OF LIQUID DYNAMIC LEVEL DETERMINATION IN WELL | 2014 |
|
RU2562628C1 |
Authors
Dates
2013-02-20—Published
2011-09-22—Filed