FIELD: oil and gas industry.
SUBSTANCE: during implementation of the method a container with open lower end of the pipes of the required volume is tightly connected to bore-hole pump inlet; flexible wear-resistant tube is tightly connected to upper part of container to bore-hole pump receiving zone; container is filled with solvent through flexible wear-resistant tube at closed discharge of flow column on well head. After that, solvent from container is supplied to flow column by means of bore-hole pump at open discharge of flow column. It is allowed to supply the solvent to the container at open discharge of flow column at simultaneous mixing of solvent from container to flow column by means of bore-hole pump on condition that solvent supply velocity to the container will not be lower than bore-hole pump capacity.
EFFECT: increasing cleaning efficiency.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REMOVING DEPOSITS FROM BORE-HOLE PUMP AND FLOW COLUMN | 2010 |
|
RU2445449C1 |
METHOD OF FEEDING REAGENT INTO WELL TUBING | 2011 |
|
RU2464409C1 |
FLUSHING METHOD OF WELL SUBMERSIBLE ELECTRIC CENTRIFUGAL PUMP | 2012 |
|
RU2513889C1 |
DEVICE TO CLEAN TUBING OF SEDIMENTS | 2010 |
|
RU2452850C1 |
FLUSHING METHOD OF WELL SUBMERSIBLE ELECTRIC-CENTRIFUGAL PUMP BY REAGENT | 2011 |
|
RU2475628C1 |
METHOD FOR DETERMINING PIPELINE DEPOSIT VOLUME | 2011 |
|
RU2445545C1 |
METHOD OF EVALUATION OF DEPOSIT VOLUME IN WELL FLOW COLUMN | 2011 |
|
RU2457324C1 |
DIAGNOSTICS METHOD OF DARP LOCATION IN WELL | 2019 |
|
RU2703552C1 |
METHOD OF DELIVERING A SOLVENT IN A WELL | 2019 |
|
RU2709921C1 |
METHOD OF FLOW COLUMN CLEANING FROM ASPHALT-TAR-PARAFFIN DEPOSITS | 2012 |
|
RU2495232C1 |
Authors
Dates
2012-03-20—Published
2010-10-18—Filed