FIELD: mining.
SUBSTANCE: method involves development of upper part of the pit along temporary lines using dump trucks with stiff frames to the intermediate contour determined with conditions of efficient use of the latter, and further development of the pit using articulated dump trucks and steeply inclined haulage berms. Formation of boundary contours of the pit is performed based on its mining through complete design depth with steeply inclined haulage berms with movement of mined rock directly to external dumps and storage areas.
EFFECT: higher development efficiency due to reduced volumes of overburden operations at increase in complete extraction of deposits.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
METHOD FOR COMPLETION OF OPEN PIT WITH TWO CLOSELY LOCATED ORE BODIES | 2013 |
|
RU2540735C1 |
OPENCAST WITH TWO CLOSELY LOCATED ORE BODIES DEVELOPMENT METHOD | 2008 |
|
RU2382200C1 |
METHOD OF COMBINED OPEN-CUT AND UNDERGROUND STEEPLY PITCHING DEPOSIT DEVELOPMENT | 2005 |
|
RU2278261C1 |
OPEN DEVELOPMENT OF STEEP ORE BODIES | 2014 |
|
RU2571776C1 |
METHOD FOR OPENCAST STEEP DEPOSIT MINING | 2005 |
|
RU2294434C1 |
METHOD OF COMBINED MINERAL DEPOSIT DEVELOPMENT | 2006 |
|
RU2331767C1 |
INTRA-BOARD TRANSFER POINT FOR DEEP PITS OF AREAL FORM | 2015 |
|
RU2584173C1 |
METHOD OF COMBINED DEVELOPMENT OF ELONGATED DEPOSITS OF STEEPLY PITCHING SEAMS | 2013 |
|
RU2515649C1 |
METHOD FOR FORMATION OF STEEPLY INCLINED TRANSPORT ACCESS TRACK | 2010 |
|
RU2425220C1 |
Authors
Dates
2012-10-20—Published
2010-12-03—Filed