FIELD: mining.
SUBSTANCE: method involves blasting of rock massif, mining of temporary inclined trench of increased width with horizontal platform at its bottom, development of blasted rock massif with wedge-shaped entry ways, starting from lower one, by using an excavator, in one half of inclined trench on the side of worked-out area. Mined rock is transported in the second half of trench to the surface; upper entry way is mined with bulldoser; mined rock is transported to the bottom of lower entry way and steeply inclined access track is formed. The second half of inclined trench is developed in the same way by transporting the mined rock along already formed section of steeply inclined access track; width of access track sections is reduced to design one and downstream slope of steeply inclined access track is formed as per design marks.
EFFECT: higher efficiency of forming steeply inclined transport access track.
6 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ARRANGEMENT OF SEMI-STEEP TRENCH | 2015 |
|
RU2614835C2 |
METHOD OF ARRANGEMENT OF STEEP TRENCH | 2014 |
|
RU2574891C1 |
METHOD OF MAKING STEEP TRENCH | 2013 |
|
RU2534297C1 |
DEVELOPMENT METHOD OF MINERAL RESOURCES BY SPIRAL PIT | 2010 |
|
RU2435032C1 |
METHOD OF PREPARATION OF NEW HAULAGE LEVEL AND EXCAVATOR-RAILWAY COMPLEX FOR METHOD EMBODIMENT | 2000 |
|
RU2186982C1 |
METHOD OF OPENCAST MINING OF DEPOSIT OF MINERAL RESOURCES | 0 |
|
SU1794191A3 |
METHOD FOR FORMATION OF OPEN PIT TRANSFER POINT | 1992 |
|
RU2039267C1 |
METHOD FOR CLOSELY LOCATED ORE BODIES CUTTING WITH SEPARATE PITS | 2005 |
|
RU2294433C1 |
METHOD OF OPEN MINING OF STEEPLY PITCHING FIELDS OF AREAL FORM USING HYDRAULIC BACKHOE EXCAVATORS | 2015 |
|
RU2574749C1 |
STRIP MINING OF MINERALS INCLUDING WORKING OF ORE BODIES IN CONTACT BETWEEN ORE AND CAPPING IN SUB-BENCHES | 2013 |
|
RU2524716C1 |
Authors
Dates
2011-07-27—Published
2010-02-10—Filed