FIELD: mining, particularly opencast mining of mineral deposits in the case of limited vertical ore bodies, for instance kimberlite pipes.
SUBSTANCE: method involves forming pit sides having inclinations less than minimal possible ones to provide pit side stability; preparing rock for further excavation by drilling-and-blasting operations; transporting ore and overburden via main incline by wheeled vehicle; forming transfer point plate at the second stage; excavating up to design depth along with forming pit sides having maximal possible inclinations, which provide pit side stability; cutting main incline from transfer point plate, wherein inclination thereof is increased in longitudinal direction; cutting ore pillars of the first stage; forming pit side having high ledges; forming lower ledge along ore body outline; forming temporary incline in one pit part; transporting ore and overburden to transfer point plate by means of caterpillar vehicle; forming temporary incline to provide pit cutting to design depth and cutting ore pillars under temporary incline.
EFFECT: increased efficiency of deposit excavation due to reduced overburden volume within the bounds of deep limited pits.
3 cl, 1 ex, 1 tbl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
OPENCAST WITH TWO CLOSELY LOCATED ORE BODIES DEVELOPMENT METHOD | 2008 |
|
RU2382200C1 |
OPEN DEVELOPMENT OF STEEP ORE BODIES | 2014 |
|
RU2571776C1 |
METHOD FOR COMPLETION OF OPEN PIT WITH TWO CLOSELY LOCATED ORE BODIES | 2013 |
|
RU2540735C1 |
METHOD FOR RECONSTRUCTING QUARRY WITH TWO PROXIMATE ORE BODIES | 2002 |
|
RU2230192C1 |
METHOD OF COMBINED MINERAL DEPOSIT DEVELOPMENT | 2006 |
|
RU2331767C1 |
OPEN DEVELOPMENT METHOD OF MINERAL DEPOSITS | 2009 |
|
RU2425219C1 |
PROCESS OF OPENCAST MINING OF STEEPLY INCLINED KIMBERLITE DEPOSITS | 2000 |
|
RU2180041C2 |
METHOD FOR OPEN EXTRACTION OF MINERAL RESOURCES DEPOSITS | 2003 |
|
RU2256795C1 |
METHOD OF COMBINED OPEN-CUT AND UNDERGROUND STEEPLY PITCHING DEPOSIT DEVELOPMENT | 2005 |
|
RU2278261C1 |
Authors
Dates
2007-02-27—Published
2005-09-27—Filed