FIELD: construction.
SUBSTANCE: device to reinforce building walls comprises horizontal elements installed in wall indents, stops installed at least at one side from a reconstructed wall, which mechanical threaded tensioning devices, boring injection piles, support plates equipped with hinged joints, fixed in soil and deepened into soil with an inclined metal pipe.
EFFECT: reinforcement and unloading of building bearing walls, there basement areas.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
FOUNDATION OF RECONSTRUCTED BUILDING | 2010 |
|
RU2431718C1 |
DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES AND METHOD FOR ERECTING THE DEVICE FOR REINFORCING FOUNDATIONS OF BUILDINGS AND STRUCTURES | 1993 |
|
RU2068916C1 |
DEVICE TO UNLOAD BEARING WALLS OF BUILDINGS | 2012 |
|
RU2503788C1 |
METHOD OF RECONSTRUCTION AND VERTICAL EXTENSION OF BUILDINGS | 2015 |
|
RU2598615C1 |
DEVICE FOR REINFORCING FOUNDATIONS OF THE EXISTING BUILDINGS AND STRUCTURES | 1993 |
|
RU2074287C1 |
ARRANGEMENT STRENGTHENING STONE WALLS OF BUILDINGS | 2001 |
|
RU2205926C1 |
PROCESS OF REINFORCEMENT OF STONE STRUCTURES OF BUILDING | 2000 |
|
RU2196868C2 |
METHOD OF STRENGTHENING FOUNDATION AT RECONSTRUCTION | 2016 |
|
RU2633619C1 |
CONSTRUCTION BUILDING STONE WALL MOUNTS | 2014 |
|
RU2578132C1 |
PROCEDURE OF REINFORCEMENT OF FOUNDATION AND FOOTING OF EXISTING CONSTRUCTION STRUCTURES | 2001 |
|
RU2211289C2 |
Authors
Dates
2012-10-27—Published
2011-02-25—Filed