FIELD: oil and gas industry.
SUBSTANCE: restoring method of sealing of casing strings consists in preparation of mixture consisting of cement with aluminosilicate microspheres. Mixture is pumped to the well with water-intake capacity of more than 250 m3/day to the leak interval of casing string and displaced after the casing string so that pressure exceeding the microsphere destruction pressure is created at the end of pumping process, and the well is flushed. Besides, 0.05-0.2% (of cement weight) of fibres with sizes of 3-18 mm long and with diameter of 22-35 mcm are added to mixture composition. Content of microspheres does not exceed 20% in mixture. Besides, after microsphere destruction pressure is achieved, pumping of mixture is stopped, and pressure drop is performed at least in three minutes, but not more than the thickening time of grouting mixture in casing string.
EFFECT: increasing strength and service life of cement stone due to the ratio of aluminosilicate microspheres with cement and by adding reinforcing fibre of the specified length.
2 cl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RECOVERY OF CASING SEALING | 2002 |
|
RU2211305C1 |
METHOD OF CEMENTING CASING STRING IN WELL | 2023 |
|
RU2823955C1 |
METHOD OF REPAIR-INSULATION WORKS IN WELL (VERSIONS) | 2015 |
|
RU2599154C1 |
CASING STRING CEMENTING METHOD IN WELL | 2019 |
|
RU2720025C1 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRING AND ELIMINATION OF BEHIND-CASING FLOWS | 2013 |
|
RU2518620C1 |
METHOD FOR RESTORING TIGHTNESS OF PRODUCTION STRINGS | 1997 |
|
RU2116432C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
METHOD OF REPEATED CEMENTING OF WELLS | 2002 |
|
RU2214502C1 |
Authors
Dates
2013-01-10—Published
2011-08-05—Filed